Establish Relationship Between Critical Delay Factors and Rectification Measures for the Malaysian Construction Industry | Research Square window.SnipcartSettings = { analytics: { enabled: false } }; (function() { var accessVector = localStorage.getItem('access_vector') || ''; window.dataLayer = window.dataLayer || []; if (accessVector) { window.dataLayer.push({ user: { profile: { profileInfo: { snid: accessVector } } } }); } })(); (function(w,d,s,l,i){w[l]=w[l]||[];w[l].push({'gtm.start':new Date().getTime(),event:'gtm.js'});var f=d.getElementsByTagName(s)[0],j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:'';j.async=true;j.src='https://www.googletagmanager.com/gtm.js?id='+i+dl;f.parentNode.insertBefore(j,f);})(window,document,'script','dataLayer','GTM-K279D39R'); Browse Preprints In Review Journals COVID-19 Preprints AJE Video Bytes Research Tools Research Promotion AJE Professional Editing AJE Rubriq About Preprint Platform In Review Editorial Policies Our Team Advisory Board Help Center Sign In Submit a Preprint Cite Share Download PDF Research Article Establish Relationship Between Critical Delay Factors and Rectification Measures for the Malaysian Construction Industry Abid Hussain Mughal, Mohd Hafizal Hanipah, Sasitharan Nagapan, and 6 more This is a preprint; it has not been peer reviewed by a journal. https://doi.org/ 10.21203/rs.3.rs-5667674/v1 This work is licensed under a CC BY 4.0 License Status: Posted Version 1 posted You are reading this latest preprint version Abstract The construction sector plays a crucial role in Malaysia's socio-economic growth, as high-rise building construction projects contribute approximately 4.7% to 7.2% of the national GDP annually. Despite their importance, project delays continue to present a significant challenge, frequently caused by subpar workmanship, a shortage of labour, ineffective site management, financial limitations, and adverse weather conditions. To capture a diverse range of perspectives from construction professionals, the study used a substantial sample size during data collection, thus bolstering the credibility and applicability of its findings. A carefully designed questionnaire, informed by insights from an initial study, was employed to conduct the survey. The questionnaire consisted of 43 delay factors commonly found in the research literature and seven additional factors from the initial pilot survey. Participants assessed the importance of each delay factor by utilising a 5-point Likert scale ranging from "not significant" to "extremely significant. " The aim was to determine the order and significance of factors causing delays in construction endeavours. Significant findings suggest that a lack of staff, financial challenges, insufficient planning, client approval delays, material scarcity, and ineffective site management primarily cause delays. The challenges have a notable effect on stakeholders, resulting in delays, monetary setbacks, and, in some cases, project rejection. The study emphasises the capability of combining Construction Drone Technology (CDT) with Building Information Modelling (BIM) to address these delays efficiently. The integration significantly improves real-time monitoring, logistics planning efficiency, minimisation of material wastage, and fosters better communication among project teams. Moreover, there is a focus on training project stakeholders, such as consultants and contractors, to improve their grasp of delay factors and strategies for mitigation. Civil Engineering High-rise building construction delay factors rectification measures construction drone technology (CDT) Building information modelling (BIM) Full Text Additional Declarations Declaration of ethics statement is as under: Study Involving human participants:“The study was approved by the institutional review board of Universiti Tun HusseinOnn Malaysia (February 04, 2024), and informed consent was obtained from all individual participants included in the study". The authors declare no competing interests. Cite Share Download PDF Status: Posted Version 1 posted You are reading this latest preprint version Research Square lets you share your work early, gain feedback from the community, and start making changes to your manuscript prior to peer review in a journal. As a division of Research Square Company, we’re committed to making research communication faster, fairer, and more useful. We do this by developing innovative software and high quality services for the global research community. Our growing team is made up of researchers and industry professionals working together to solve the most critical problems facing scientific publishing. Also discoverable on Platform About Our Team In Review Editorial Policies Advisory Board Help Center Resources Author Services Accessibility API Access RSS feed Manage Cookie Preferences © Research Square 2026 | ISSN 2693-5015 (online) Privacy Policy Terms of Service Do Not Sell My Personal Information {"props":{"pageProps":{"initialData":{"identity":"rs-5667674","acceptedTermsAndConditions":true,"allowDirectSubmit":true,"archivedVersions":[],"articleType":"Research Article","associatedPublications":[],"authors":[{"id":391803462,"identity":"02b513bf-d6f4-426e-8654-2baac7af9c2d","order_by":0,"name":"Abid Hussain Mughal","email":"","orcid":"https://orcid.org/0009-0001-1038-2968","institution":"Faculty of Civil Engineering and Built Environment, Universiti Tun Hussein Onn Malaysia, Batu Pahat, Johor 86400 Malaysia","correspondingAuthor":false,"prefix":"","firstName":"Abid","middleName":"Hussain","lastName":"Mughal","suffix":""},{"id":391803463,"identity":"6380c88b-dd78-42b1-b119-69902494b7ec","order_by":1,"name":"Mohd Hafizal Hanipah","email":"data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAZAAAAAyAQMAAABI0h/eAAAABlBMVEX///8AAABVwtN+AAAACXBIWXMAAA7EAAAOxAGVKw4bAAAA2ElEQVRIiWNgGAWjYBACAwbGBwcYGCzkGBh4QHxmYrQwGwC1SBgzsJGiBUhJJDYQrcWc/TDjwR81Eukb7vce3cBQYZ3YIHbGAK8Wy55khgMSxyRyNxzjS7vBcCY9sUE6B78WgwP5Bw4YsIG08JjdYGw7TISW848ZDiT8k0g3AGv5R4yWG0CHHWyTSIBoaSBKy2OGg419EoYzj+WY3Ug4lm7cJp1WQMBhycwff3yzkec7fMbsxocaa9l+6eQNeLWgggQgZmPgwO8wbID9AclaRsEoGAWjYFgDAF2BSh+HkfKCAAAAAElFTkSuQmCC","orcid":"","institution":"Faculty of Civil Engineering and Built Environment, Universiti Tun Hussein Onn Malaysia, Batu Pahat, Johor 86400 Malaysia","correspondingAuthor":true,"prefix":"","firstName":"Mohd","middleName":"Hafizal","lastName":"Hanipah","suffix":""},{"id":391803464,"identity":"272efdfd-909e-488d-989d-36ef29e4609f","order_by":2,"name":"Sasitharan Nagapan","email":"","orcid":"","institution":"Faculty of Civil Engineering and Built Environment, Universiti Tun Hussein Onn Malaysia, Batu Pahat, Johor 86400 Malaysia","correspondingAuthor":false,"prefix":"","firstName":"Sasitharan","middleName":"","lastName":"Nagapan","suffix":""},{"id":391803465,"identity":"a3716bca-e137-4799-912d-effe1c38f0ef","order_by":3,"name":"Samiullah Sohu","email":"","orcid":"","institution":"School of Architecture and Civil Engineering. University of Adelaide, Australia","correspondingAuthor":false,"prefix":"","firstName":"Samiullah","middleName":"","lastName":"Sohu","suffix":""},{"id":391803466,"identity":"21fcf53f-b2d8-4149-855f-ffe223234c06","order_by":4,"name":"Farhad Ali Malang","email":"","orcid":"","institution":"Local Government and Rural Development (LG\u0026RD) Gilgit, Gilgit - Baltistan, 15100 Pakistan","correspondingAuthor":false,"prefix":"","firstName":"Farhad","middleName":"Ali","lastName":"Malang","suffix":""},{"id":391803467,"identity":"daea5e13-13ff-46bf-bdc1-d74a97daa8bb","order_by":5,"name":"Riduan Yunus","email":"","orcid":"","institution":"Faculty of Civil Engineering and Built Environment, Universiti Tun Hussein Onn Malaysia, Batu Pahat, Johor 86400 Malaysia","correspondingAuthor":false,"prefix":"","firstName":"Riduan","middleName":"","lastName":"Yunus","suffix":""},{"id":391803468,"identity":"1a35739d-8b81-419f-96dd-c5d90bfeaea6","order_by":6,"name":"Mohd Khairuddin Abd Karim","email":"","orcid":"https://orcid.org/0009-0005-2163-7136","institution":"Faculty of Civil Engineering and Built Environment, Universiti Tun Hussein Onn Malaysia, Batu Pahat, Johor 86400 Malaysia","correspondingAuthor":false,"prefix":"","firstName":"Mohd","middleName":"Khairuddin Abd","lastName":"Karim","suffix":""},{"id":391803469,"identity":"3da151ce-0f50-4def-98d7-9c1797e0ffb8","order_by":7,"name":"Aawag Mohsen Alawag","email":"","orcid":"","institution":"Department of Civil Engineering, Sana’a University, Sana’a, Yemen","correspondingAuthor":false,"prefix":"","firstName":"Aawag","middleName":"Mohsen","lastName":"Alawag","suffix":""},{"id":391803470,"identity":"482799a8-2c2f-4388-93bb-4f79f9768b09","order_by":8,"name":"Zaidah Abdul Aziz","email":"","orcid":"","institution":"Commerce Department, Ungku Omar Polytechnic, Ipoh, Perak 30000 Malaysia","correspondingAuthor":false,"prefix":"","firstName":"Zaidah","middleName":"Abdul","lastName":"Aziz","suffix":""}],"badges":[],"createdAt":"2024-12-18 08:50:27","currentVersionCode":1,"declarations":{"humanSubjects":false,"vertebrateSubjects":false,"conflictsOfInterestStatement":false,"humanSubjectEthicalGuidelines":false,"humanSubjectConsent":false,"humanSubjectClinicalTrial":false,"humanSubjectCaseReport":false,"vertebrateSubjectEthicalGuidelines":false},"doi":"10.21203/rs.3.rs-5667674/v1","doiUrl":"https://doi.org/10.21203/rs.3.rs-5667674/v1","draftVersion":[],"editorialEvents":[],"editorialNote":"","failedWorkflow":false,"files":[{"id":72304710,"identity":"66aca15f-2f91-41c1-a559-fc108ae72e1e","added_by":"auto","created_at":"2024-12-25 03:28:06","extension":"pdf","order_by":1,"title":"","display":"","copyAsset":false,"role":"manuscript-pdf","size":407938,"visible":true,"origin":"","legend":"","description":"","filename":"MANUSCRIPT.pdf","url":"https://assets-eu.researchsquare.com/files/rs-5667674/v1_covered_3ba289e3-4233-4a48-9d47-20acfe8caec7.pdf"}],"financialInterests":"\u003cp\u003eDeclaration of ethics statement is as under: Study Involving human participants:“The study was approved by the institutional review board of Universiti Tun HusseinOnn Malaysia (February 04, 2024), and informed consent was obtained from all individual participants included in the study\".\u003c/p\u003e\n\u003cp\u003eThe authors declare no competing interests.\u003c/p\u003e","formattedTitle":"\u003cp\u003eEstablish Relationship Between Critical Delay Factors and Rectification Measures for the Malaysian Construction Industry\u003c/p\u003e","fulltext":[],"fulltextSource":"","fullText":"","funders":[],"hasAdminPriorityOnWorkflow":false,"hasManuscriptDocX":false,"hasOptedInToPreprint":true,"hasPassedJournalQc":"","hasAnyPriority":true,"hideJournal":true,"highlight":"","institution":"Tun Hussein Onn University of Malaysia","isAcceptedByJournal":false,"isAuthorSuppliedPdf":true,"isDeskRejected":"","isHiddenFromSearch":false,"isInQc":false,"isInWorkflow":false,"isPdf":true,"isPdfUpToDate":true,"isWithdrawnOrRetracted":false,"journal":{"display":true,"email":"
[email protected]","identity":"researchsquare","isNatureJournal":false,"hasQc":true,"allowDirectSubmit":true,"externalIdentity":"","sideBox":"","snPcode":"","submissionUrl":"/submission","title":"Research Square","twitterHandle":"researchsquare","acdcEnabled":true,"dfaEnabled":false,"editorialSystem":"","reportingPortfolio":"","inReviewEnabled":false,"inReviewRevisionsEnabled":true},"keywords":"High-rise building construction, delay factors, rectification measures, construction drone technology (CDT), Building information modelling (BIM)","lastPublishedDoi":"10.21203/rs.3.rs-5667674/v1","lastPublishedDoiUrl":"https://doi.org/10.21203/rs.3.rs-5667674/v1","license":{"name":"CC BY 4.0","url":"https://creativecommons.org/licenses/by/4.0/"},"manuscriptAbstract":"\u003cp\u003eThe construction sector plays a crucial role in Malaysia's socio-economic growth, as high-rise building construction projects contribute approximately 4.7% to 7.2% of the national GDP annually. Despite their importance, project delays continue to present a significant challenge, frequently caused by subpar workmanship, a shortage of labour, ineffective site management, financial limitations, and adverse weather conditions. To capture a diverse range of perspectives from construction professionals, the study used a substantial sample size during data collection, thus bolstering the credibility and applicability of its findings. A carefully designed questionnaire, informed by insights from an initial study, was employed to conduct the survey. The questionnaire consisted of 43 delay factors commonly found in the research literature and seven additional factors from the initial pilot survey. Participants assessed the importance of each delay factor by utilising a 5-point Likert scale ranging from \"not significant\" to \"extremely significant. \" The aim was to determine the order and significance of factors causing delays in construction endeavours. Significant findings suggest that a lack of staff, financial challenges, insufficient planning, client approval delays, material scarcity, and ineffective site management primarily cause delays. The challenges have a notable effect on stakeholders, resulting in delays, monetary setbacks, and, in some cases, project rejection. The study emphasises the capability of combining Construction Drone Technology (CDT) with Building Information Modelling (BIM) to address these delays efficiently. The integration significantly improves real-time monitoring, logistics planning efficiency, minimisation of material wastage, and fosters better communication among project teams. Moreover, there is a focus on training project stakeholders, such as consultants and contractors, to improve their grasp of delay factors and strategies for mitigation.\u003c/p\u003e","manuscriptTitle":"Establish Relationship Between Critical Delay Factors and Rectification Measures for the Malaysian Construction Industry","msid":"","msnumber":"","nonDraftVersions":[{"code":1,"date":"2024-12-25 03:19:58","doi":"10.21203/rs.3.rs-5667674/v1","editorialEvents":[{"type":"communityComments","content":0}],"status":"published","journal":{"display":true,"email":"
[email protected]","identity":"researchsquare","isNatureJournal":false,"hasQc":true,"allowDirectSubmit":true,"externalIdentity":"","sideBox":"","snPcode":"","submissionUrl":"/submission","title":"Research Square","twitterHandle":"researchsquare","acdcEnabled":true,"dfaEnabled":false,"editorialSystem":"","reportingPortfolio":"","inReviewEnabled":false,"inReviewRevisionsEnabled":true}}],"origin":"","ownerIdentity":"06978270-a220-4f9e-bcae-977834b58d4f","owner":[],"postedDate":"December 25th, 2024","published":true,"recentEditorialEvents":[],"rejectedJournal":[],"revision":"","amendment":"","status":"posted","subjectAreas":[{"id":41762837,"name":"Civil Engineering"}],"tags":[],"updatedAt":"2024-12-25T03:19:58+00:00","versionOfRecord":[],"versionCreatedAt":"2024-12-25 03:19:58","video":"","vorDoi":"","vorDoiUrl":"","workflowStages":[]},"version":"v1","identity":"rs-5667674","journalConfig":"researchsquare"},"__N_SSP":true},"page":"/article/[identity]/[[...version]]","query":{"redirect":"/article/rs-5667674","identity":"rs-5667674","version":["v1"]},"buildId":"qtupq5eGEP_6zYnWcrvyt","isFallback":false,"isExperimentalCompile":false,"dynamicIds":[84888],"gssp":true,"scriptLoader":[]}
Text is read by the "Ask this paper" AI Q&A widget below.
Extraction quality varies by source — PMC NXML preserves structure
cleanly, OA-HTML may include some navigation residue, and OA-PDF can
have broken hyphenation. The publisher copy
(via DOI)
is the canonical version.