Direct Observation of Positron Capture Process at the Positron Source of the SuperKEKB B-Factory

preprint OA: closed
View at publisher

Abstract

A direct simultaneous detection of electron (e - ) and positron (e + ) bunches was successfully performed using wideband beam monitors and a detection system at the (e + ) capture section of the SuperKEKB B-factory. The time intervals between the secondary-generated (e - ) and (e + ) bunches were measured to investigate their dynamical capture process. The results show that the time intervals were measured in the range of 20--280 ps on average, and the line-order switch of the (e - ) and (e + ) bunches and their dynamical phase-slip process in the axial direction were clearly observed as a function of the capture phase of accelerating structures. In this report, the dynamical capture and phase-slip process for the (e - ) and(e + ) bunches under the two-bunch acceleration scheme is described in detail. This study opens up a new window for direct observation of the (e - ) and (e + ) capture process at any present and future (e + ) sources.

My notes (saved in your browser only)

Citation neighborhood (no data yet)

We don't have any in-corpus citations linked to this paper yet. The paper's references may be in our DB but unresolved to ``paper_id`` (resolution happens at ingest when the cited DOI matches a row we already have). Run the cross-source citation reconcile pass to retry.

Source provenance

europepmc
last seen: 2026-05-19T01:45:01.086888+00:00