Integrating Electricity Market Granularity and Sector Coupling: Adaptive Power-to-X Scheduling Optimization under Dynamic Electricity Markets

preprint OA: closed
View at publisher

Abstract

Sub-hourly operational optimization of Power-to-X (PtX) hydrogen systems remains largely unexplored, despite their growing importance as flexible assets in renewable-dominated energy systems. Existing models typically assume hourly market resolution and linear process behavior, overlooking how intra-hour price volatility and non-linear electrolyzer efficiencies shape operational costs, flexibility, and emissions. This study pioneers a data-driven optimization framework that integrates synthetic 15-minute electricity-price generation, agent-based simulation, and mixed-integer quadratically constrained programming (MIQCP) to evaluate hydrogen-production strategies under the forthcoming European 15-minute market regime. Using a Danish PtX facility with on-site wind and solar generation as a case study, the framework quantifies how adaptive scheduling compares with non-adaptive baselines across multiple volatility scenarios. Results show that dynamic 15-minute optimization reduces hydrogen-production costs by up to 40 % relative to hourly scheduling and that extending the objective function to include electricity-sales revenue improves net profitability by approximately 11%. Although adaptive scheduling slightly increases CO2 intensity due to altered renewable utilization, it substantially enhances flexibility and cost efficiency. Scientifically, the study introduces the first reproducible synthetic-data approach for sub-hourly optimization of non-linear electrolyzer systems, bridging a critical gap in demand-side-management and sector-coupling literature. Practically, it provides evidence-based guidance for PtX operators and regulators on designing adaptive, volatility-responsive control strategies aligned with Europe’s transition to high-frequency electricity markets and net-zero objectives.

My notes (saved in your browser only)

Citation neighborhood (no data yet)

We don't have any in-corpus citations linked to this paper yet. This is a recent paper (2025) — citers typically take a year or two to land, and the OpenAlex reference graph may still be filling in.

Source provenance

europepmc
last seen: 2026-05-20T01:45:00.602351+00:00