The Optimum Slash Pile Size for Grinding Operations: Grapple Excavator and Horizontal Grinder Operations Model Based on a Sierra Nevada, California Survey

preprint OA: closed
View at publisher

Abstract

The processing of woody biomass waste piles for use as fuel instead of burning them was investigated. At each landing slash pile location, a 132 kW grapple excavator was used to transfer the waste piles into a 522 kW horizontal grinder. Economies of scale could be expected when grinding a larger pile, although the efficiency of the loading operation might be diminished. Here, three piles were ground and the operations were time-studied: Small (20 m long × 15 m wide × 4 m high), Medium (30 × 24 × 4 m), and Large (35 × 30 × 4 m) piles. Grinding the Medium pile was found to be the most productive at 30.65 bone dry tons per productive machine hour without delay (BDT/PMH0), thereby suggesting that there might be an optimum size of slash pile for a grinding operation. We also examined modeling of the excavator and grinder operations, and we observed that the constructed simulation model well-replicated the actual operations. Based on the modeling, we estimated that the productivity of grinding at a landing area of 710 m2 of slash pile location was 31.24 BDT/PMH0, which was the most productive rate.

My notes (saved in your browser only)

Citation neighborhood (no data yet)

We don't have any in-corpus citations linked to this paper yet. The paper's references may be in our DB but unresolved to ``paper_id`` (resolution happens at ingest when the cited DOI matches a row we already have). Run the cross-source citation reconcile pass to retry.

Source provenance

europepmc
last seen: 2026-05-19T01:45:01.086888+00:00