BIM Manager: Responsibility, Coordination and Data Exchange Regulator
preprint
OA: closed
Abstract
Abstract: Building Information Modelling (BIM) methodology has been empowering the quality of the construction activity in all sectors: multidisciplinary designs development; construction planning and monitoring; building management and maintenance. A BIM environment aggre-gates several disciplines and different professional skillsets and in order to control and improve the quality of a BIM project, a BIM manager is required. The BIM manager has the responsibility to coordinate all tasks involved in a building design and associated activities usually workout over the project documents. This professional can access to the distinct discipline models, located in a shared platform, and request for amendments if inconsistencies are detected. The topic of the present study is illustrated with three building cases were distinct specific projects, disciplines and tasks were elaborated: collaboration between disciplines (architecture, structures and con-struction); structural analyses and reinforcement details; quantity take-off of materials and cost estimation; construction scheduling and simulation. Although there are still limitations in the implementation of BIM methodology in all sectors and stages, within the construction industry, BIM has been bringing an important improvement in the quality of a building design, reflected in the quality of the final product. The present study put in evidence the BIM manager role in pro-jects that aggregates several disciplines and experts, bringing an important contribution in the quality of a building design. BIM methodology is a current demand in the construction industry supported on advanced technology and in an adequate management of projects.
My notes (saved in your browser only)
Citation neighborhood (no data yet)
We don't have any in-corpus citations linked to this paper yet. The paper's references may be in our DB but unresolved to ``paper_id`` (resolution happens at ingest when the cited DOI matches a row we already have). Run the cross-source citation reconcile pass to retry.
Source provenance
- europepmc
- last seen: 2026-05-19T01:45:01.086888+00:00