An Assessment of Wind Power Generation Potential of Built Environment Wind Turbine (BEWT) Systems in Fort Beaufort, South Africa
preprint
OA: closed
Abstract
The physical and economic sustainability of using Built Environment Wind Turbine (BEWT) systems depends on the wind resource potential of the candidate site. Therefore, it is crucial to carry out a wind resource assessment prior to deployment of the BEWT. The assessment results can be used as a referral tool for predicting the performance and lifespan of the BEWT in the given built environment. To date, there is limited research output on BEWTs in South Africa with available literature showing a bias towards utility-scale or conventional ground based wind energy systems. This study aimed to assess wind power generation potential of BEWT systems in Fort Beaufort using the Weibull distribution function. The results show that Fort Beaufort wind patterns can be classified as fairly good and that BEWTs can best be deployed at 15m for a fairer power output as roof height wind speeds require BEWT of very low cut-in speed of at most1.2ms−1.
My notes (saved in your browser only)
Citation neighborhood (no data yet)
We don't have any in-corpus citations linked to this paper yet. The paper's references may be in our DB but unresolved to ``paper_id`` (resolution happens at ingest when the cited DOI matches a row we already have). Run the cross-source citation reconcile pass to retry.
Source provenance
- europepmc
- last seen: 2026-05-19T01:45:01.086888+00:00