Long-term Energy System Modelling for a Clean Energy Transition in Egypt's Energy Sector

preprint OA: closed
Full text JSON View at publisher

Abstract

Abstract Egypt has the potential to generate significant amounts of renewable energy, in particular solar PV, concentrated solar power (CSP), and onshore and offshore wind. The energy sector is reliant on fossil fuels, particularly natural gas, for electricity production and is at risk of locking itself into a high carbon pathway. Globally, reducing greenhouse gas (GHG) emissions associated with national energy sectors is a target outlined in the UN’s Paris Agreement. To reduce carbon dioxide (CO 2 ) emissions associated with a higher dependence on fossil fuels, Egypt must consider upscaling renewable energy technologies (RET) to achieve a clean energy transition (CET). This research modelled six scenarios using OSeMOSYS to identify the technologies and policy target improvements that are needed to upscale RETs within Egypt’s energy sector. The results showed that solar PV and onshore wind are key technologies to be upscaled to contribute towards Egypt’s CET. The optimal renewable target is the International Renewable Energy Agency’s (IRENA) 53% of electricity to be sourced from RETs by 2030, which will cost $16.4 billion more up to 2035 than Egypt’s current Integrated Sustainable Energy Strategy (ISES) target of 42% by 2035; it also saves 732.0 Mt of CO 2 over the entire modelling period to 2070. Socio-economic barriers to this transition are considered, such as recent discoveries of natural gas reserves combined with a history of energy insecurity, political instability impacting investor confidence, and a lack of international climate funding. The paper concludes with policy recommendations that would enable Egypt to progress towards achieving a CET.
Full text 235,627 characters · extracted from preprint-html · click to expand
Long-term Energy System Modelling for a Clean Energy Transition in Egypt's Energy Sector | Research Square window.SnipcartSettings = { analytics: { enabled: false } }; (function() { var accessVector = localStorage.getItem('access_vector') || ''; window.dataLayer = window.dataLayer || []; if (accessVector) { window.dataLayer.push({ user: { profile: { profileInfo: { snid: accessVector } } } }); } })(); (function(w,d,s,l,i){w[l]=w[l]||[];w[l].push({'gtm.start':new Date().getTime(),event:'gtm.js'});var f=d.getElementsByTagName(s)[0],j=d.createElement(s),dl=l!='dataLayer'?'&l='+l:'';j.async=true;j.src='https://www.googletagmanager.com/gtm.js?id='+i+dl;f.parentNode.insertBefore(j,f);})(window,document,'script','dataLayer','GTM-K279D39R'); Browse Preprints In Review Journals COVID-19 Preprints AJE Video Bytes Research Tools Research Promotion AJE Professional Editing AJE Rubriq About Preprint Platform In Review Editorial Policies Our Team Advisory Board Help Center Sign In Submit a Preprint Cite Share Download PDF Research Article Long-term Energy System Modelling for a Clean Energy Transition in Egypt's Energy Sector Anna Gibson, Zen Makuch, Rudolf Yeganyan, Naomi Tan, Carla Cannone, and 1 more This is a preprint; it has not been peer reviewed by a journal. https://doi.org/ 10.21203/rs.3.rs-2526010/v4 This work is licensed under a CC BY 4.0 License Status: Posted Version 4 posted You are reading this latest preprint version Show more versions Abstract Egypt has the potential to generate significant amounts of renewable energy, in particular solar PV, concentrated solar power (CSP), and onshore and offshore wind. The energy sector is reliant on fossil fuels, particularly natural gas, for electricity production and is at risk of locking itself into a high carbon pathway. Globally, reducing greenhouse gas (GHG) emissions associated with national energy sectors is a target outlined in the UN’s Paris Agreement. To reduce carbon dioxide (CO 2 ) emissions associated with a higher dependence on fossil fuels, Egypt must consider upscaling renewable energy technologies (RET) to achieve a clean energy transition (CET). This research modelled six scenarios using OSeMOSYS to identify the technologies and policy target improvements that are needed to upscale RETs within Egypt’s energy sector. The results showed that solar PV and onshore wind are key technologies to be upscaled to contribute towards Egypt’s CET. The optimal renewable target is the International Renewable Energy Agency’s (IRENA) 53% of electricity to be sourced from RETs by 2030, which will cost $16.4 billion more up to 2035 than Egypt’s current Integrated Sustainable Energy Strategy (ISES) target of 42% by 2035; it also saves 732.0 Mt of CO 2 over the entire modelling period to 2070. Socio-economic barriers to this transition are considered, such as recent discoveries of natural gas reserves combined with a history of energy insecurity, political instability impacting investor confidence, and a lack of international climate funding. The paper concludes with policy recommendations that would enable Egypt to progress towards achieving a CET. Clean Energy Transition Renewable Energy Technologies OSeMOSYS Egypt Energy Policy Figures Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Introduction Long-term energy system modelling can assist our understanding of how countries might transition towards clean energy systems. Egypt, a lower middle-income country, has one of the largest economies within the Middle East and North Africa (MENA) region (World Bank, 2021a). According to the World Bank Group, Egypt’s population is projected to grow to 122.6 million by 2030 from 109.3 million in 2021 (2021), placing pressure on the nation’s economy (UNDP, 2018). Large fossil fuel subsidies in the early 2010s discouraged investment in the power sector (World Bank, 2019). These subsidies, a decline in production and an increase in demand meant that the energy sector could no longer meet the demands of the growing population, resulting in severe power shortages and blackouts (World Bank, 2019). Previous political instability, such as the Arab Spring social unrest beginning in 2011, resulted in an unemployment rate of 13.1% in 2013, further exacerbating the economic situation (World Bank, 2021b). Following this, the ensuing recession caused Egypt to transition from an energy exporter in 2009 to an energy importer by 2014 (World Bank, 2019). To tackle this, the government implemented ambitious reforms in 2016, designed to restore political and macroeconomic stability, which included raising taxes, reducing fossil fuel energy subsidies, and introducing feed-in tariffs to promote renewable energy production (UNDP, 2018; IEA, 2022). These efforts have resulted in a significant increase in investment, boosting electricity production (IEA, 2022). Currently, Egypt is heavily dependent on fossil fuels for electricity production, primarily natural gas, which are supplemented by renewable resources such as hydropower, wind and solar photovoltaics (PV). Due to Egypt’s climate, the country is suitable for both wind (onshore and offshore) and solar PV and concentrated solar power (CSP). Egypt receives between 2,900–3,200 hrs of sunshine annually with total radiation intensity varying between 2,000 and 3,200 kWh/m 2 /year (IRENA, 2018b). Egypt is also suitable for harnessing wind energy with stable wind speeds between 8–10 m/s at 100 m in the Gulf of Suez area (IRENA, 2018b). Progress has been made with the building of large renewable projects such as the Benban Solar PV Park, Kom Ombo Solar PV plant and Zaafarana Wind Farm. Egypt’s current climate policies need substantial updates to be consistent with the Paris Agreement’s 1.5 o C target, such as including a quantifiable emissions reduction target within its Nationally Determined Contribution (NDC). In 2016, Egypt set a target of 42% of electricity generation to be sourced from renewable technologies by 2035 as outlined in its Integrated Sustainable Energy Strategy (ISES) (EU, 2015; IRENA, 2018b; NREA, 2020). To investigate Egypt’s potential pathway towards a clean energy transition (CET), three research objectives were set. They were: 1) To generate six scenarios that investigate the impact of upscaling RETs on Egypt’s energy system using the long-term energy system model OSeMOSYS. 2) To determine the technologies and policies that are required to ensure a CET. 3) To identify the main economic and socio-political barriers that may prevent Egypt from achieving a CET. Literature Review Current Egyptian Energy Policies Despite the lack of a quantitative target for reducing CO 2 emissions, sectors within Egypt are working towards a CET guided by strategies such as the Integrated Sustainable Energy Strategy (ISES) for 2035, Vision 2030 (Arab Development Portal, 2016) and the National Climate Change Strategy 2050 (NCCS) (EEAA, 2021). The ISES 2035 was initiated by the Egyptian Government in 2013 through a project funded by the European Union (EU, 2015). The strategy primarily aims to rapidly increase the use of renewable energy technologies (RETs) and to improve energy efficiency in the energy sector (IRENA, 2018b). The most quantifiable renewable energy targets within this strategy are 20% of electricity generation to be sourced from RETs by 2022 and 42% by 2035; the latter is broken down into different technologies as shown in Figure 1. It also includes plans to increase Egypt’s electricity generation from coal to 16% by 2035, up from 0% currently (NREA, 2020). Analysis of Egypt’s renewable target by the International Renewable Energy Agency (IRENA) in 2018 classified the ISES 2035 target as unambitious. IRENA’s scenario suggests that 53% of Egypt’s electricity generation should be sourced from RETs by 2030 (IRENA, 2018b). This target has been deemed economically feasible due to the financial mechanisms in place for renewable projects such as the Build Own Operate (BOO) schemes and bilateral foreign investment agreements into renewable projects (IRENA, 2018b). Egypt’s Vision 2030 aims to find a pathway to economic and social justice which will revive the role of Egypt in regional leadership (Arab Development Portal, 2016). At present, 30% of the total planned projects are underway, with plans for 50% by June 2025. Prominent green projects include the Benban Solar PV, wastewater treatment plants, and the desalination project at El Dabaa (EgyptToday, 2021). Most recently, a development cooperation portfolio of $26 billion is set to fund 372 ongoing projects under Vision 2030 in various sectors that are aligned with the SDGs (Daily News Egypt, 2022). The recently published NCCS 2050 addresses climate change impacts, and it aims to (1) improve the quality of life for Egyptian citizens, (2) achieve sustainable development and economic growth, and (3) strengthen Egypt’s leadership at the international level (EEAA, 2021). The NCCS 2050 emphasises integrated action between strategies and sectors, utilising financing opportunities under the Paris Agreement from international sources, such as the Green Climate Fund (GCF) and the World Bank, and strengthening international bilateral and multilateral cooperation (EEAA, 2021). At the international level, Egypt ratified the Paris Agreement in 2017 and its NDC action plan aims to develop policy targets that rely on five main pillars: the efficient use of energy, the increased use of renewable energy, the use of locally appropriate and more efficient fossil fuel technologies (including nuclear), the use of energy efficiency to decouple energy demand and economic growth, and the reform of energy subsidies (UNFCCC, 2017). Overall, the NDC stresses the importance of international financial assistance to develop policy targets and focuses on qualitative mitigation and adaptation measures; but it fails to mention a quantifiable CO 2 or GHG reduction target, or a net zero target. An update to Egypt’s NDC in June 2022 also did not provide any quantifiable targets (UNFCCC, 2022). Previous Modelling Work National-scale examples of previous OSeMOSYS modelling projects include the examination of Cyprus’ natural gas outlook (Taliotis et al ., 2017) and meeting Bolivia’s Intended Nationally Determined Contribution (INDC) (UNFCCC, n.d.). Larger scale projects include The Electricity Model Base for Africa (TEMBA) study, which investigated the electricity supply systems of 47 countries and generated a 2040 scenario that showed how an enhanced grid network can alter Africa’s generation mix and reduce electricity generation costs (Taliotis et al. , 2016). OSeMOSYS analysis has been expanded to the global scale in a study that used the GENeSYS-MOD Global Energy System Model to assess the feasibility of global decarbonisation pathways and concluded that a reorientation of the energy system would be driven by decreasing costs of renewable energy sources, leading to the phase out of fossil fuels (Löffler et al ., 2017). Previous modelling studies have been conducted for Egypt using both OSeMOSYS and other long term energy system models. A key study by Mondal et al . used the TIMES energy system model to examine Egypt’s energy policy goals as reflected in Egypt’s Vision 2030 (2018). This study concluded that the current supply of energy needs to diversify from predominantly natural gas to a mix of technologies, and that it may be wise to target promotion of renewable energy for power generation and to develop a low-carbon society (Mondal et al ., 2018). This study included a renewable energy development scenario based on Vision 2030. In comparison, the study described here is based on ISES 2035 targets and IRENA’s proposed modifications. Rady et al. ’s paper used OSeMOSYS to model Egypt’s power generation sector and to provide policymakers with information to better plan for future investments in the power sector (2018). It concluded that the lowest cost electricity generation mix always includes hydropower, natural gas-fired steam cycles, wind power and solar PV rooftop technologies (Rady et al ., 2018). This study focused on the analysis of two different energy demand scenarios and did not investigate increasing renewable energy technologies for power generation in Egypt. Experimental The Open-Source Energy Modelling System (OSeMOSYS) was used to define a long-term decarbonisation strategy for Egypt’s energy sector. OSeMOSYS is a dynamic, bottom-up, multi-year energy system model that applies linear optimisation techniques to determine an array of least-cost technologies to satisfy a defined energy demand. It uses energy system parameters sourced from international and national datasets, and these were constrained to generate six scenarios. The scenario outputs were analysed against the criteria of CO 2 emissions and cost to determine a pathway towards a CET for Egypt’s energy sector. The model is driven to satisfy an exogenously defined energy demand, which can be achieved through a combination of technologies and fuels (Taliotis et al ., 2016). A ‘technology’ in OSeMOSYS has a flexible definition and can comprise of any fuel use and conversion, from resource extraction and processing to generation, transmission and distribution, as well as appliances (Moksnes et al ., 2015). A ‘technology’ is intended as a black-box with user-defined transfer functions and characteristics, alongside fuels that represent any energy vector, energy service or proxy entering or exiting a technology, such as an input of natural gas and output of electricity for a natural gas power plant (Gardumi et al ., 2018). The technologies and fuels represented in this modelling are shown in Table 1. Table 1. The power plant technologies and corresponding fuels (under commodities) used in this study. Source: OSeMOSYS Model Sets Tab. Technologies Commodities Code Description Code Description PWRBIO001 Biomass Power Plant OIL Crude Oil PWRCOA001 Coal Power Plant BIO Biomass PWRGEO Geothermal Power Plant COA Coal PWROHC001 Light Fuel Oil Power Plant LFO Light Fuel Oil PWROHC002 Oil Fired Gas Turbine (Simple Cycle Gas Turbine (SCGT)) NGS Natural Gas PWRNGS001 Gas Power Plant (Combined Cycle Gas Turbine (CCGT)) HFO Heavy Fuel Oil PWRNGS002 Gas Power Plant (SCGT) SOL Solar PWRSOL001 Solar PV (Utility) HYD Hydropower PWRSOL002 Solar PV (Distributed with Storage) WND Wind PWRCSP001 CSP without Storage URN Uranium PWRCSP002 CSP with Storage GEO Geothermal PWRHYD001 Large Hydropower Plant (Dam) (>100MW) ELC001 Electricity from Power Plants PWRHYD002 Medium Hydropower Plant (10-100MW) ELC002 Electricity after Transmission PWRHYD003 Small Hydropower Plant (<10MW) ELC003 Electricity after Distribution PWRHYD004 Off-grid Hydropower PWRWND001 Onshore Wind PWRWND002 Offshore Wind PWRNUC Nuclear Power Plant PWRSOL001S Utility-scale PV with 2-hour Storage PWRWND001S Onshore Wind Power Plant with Storage In short, OSeMOSYS prioritises the least-cost pathway formed from technologies to determine a country or region’s future energy mix (Howells et al. , 2011). An optimal least-cost approach is useful for operational analysis of variable and fixed costs of both short-term upfront capital costs and long-term investment plans (Gardumi et al ., 2019). Due to the model’s open-source nature, the input data is ideally free and publicly available. This overcomes a significant barrier when modelling the energy systems of countries with developing economies, as access to data has previously been proven to delay the decision-making process (Allington et al. , 2021). OSeMOSYS has a user-friendly Excel-based graphical user interface: the parameters are inputted via Climate Compatible Growth’s (CCG) Simple and Nearly Done (clicSAND) interface to generate a *csv Excel output file. A combination of accessibility and transparency made OSeMOSYS an appropriate model to use in this research. A thorough description of the methodology on how to run the model and use the clicSAND interface can be found on Zenodo (Gibson, 2023). Constraints Technical constraints, emission limits or economic realities can be applied to the technologies within the model to generate scenarios or to reflect operational requirements, governmental policies or socio-economic realities (Taliotis et al ., 2016). These constraints can include altering the relationship between different types of energy inputs and outputs, placing upper limits on GHG emissions, lower limits on renewable generation or upper and lower limits on financial investment (Gardumi et al ., 2018). Several constraints were used to generate the six scenarios, explained in the following subsection. Scenarios To investigate the impact of upscaling RETs for Egypt’s CET, six scenarios were modelled for Egypt’s energy sector. The decision to base the scenarios on upscaling renewables was made in consultation with the Energy Transition Council (ETC). The ETC is a UK Government body formed ahead of COP26. It aims to ensure that clean and sustainable power is the most reliable and affordable option for all (UK Government, 2022). A summary of the scenarios is shown in Table 2, and they are explained in more detail in this subsection. Table 2. Summary of Scenarios. Scenario Code Scenario Name Description/Purpose LC Least Cost Represents the least cost future for Egypt’s energy system with no policy interventions. FFF Fossil Fuel Future Quantifies the emissions generated and the cost of relying on fossil fuels. NZ2050 Net Zero by 2050 Identifies the range of technologies needed to decrease CO 2 emissions to net zero by 2050. ISES2035 Integrated Sustainable Energy Strategy 2035 Models Egypt’s ISES 2035 target of reaching 42% of electricity generation from renewables by 2035. IRENA2030 IRENA’s REmap 2030 Analysis Models IRENA’s suggestion that the ISES 2035 renewables target should be upgraded to 53% by 2030. 60BY2035 60% Renewables by 2035 Models the scenario where 60% of Egypt’s electricity generation comes from renewables by 2035. The Least Cost (LC) scenario represents the reference scenario for Egypt’s energy sector, where fossil fuel technologies and RETs generate electricity with limited constraints and without policy intervention to minimise cost. Reduced timeslices (see Temporal Structure subsection) were applied and technologies and commodities needed to meet transport demand were removed as including these produced results with a much higher fossil fuel capacity demand than is possible within Egypt. The technology that represents transmission imports in the power sector (PWRTRNIMP) was also removed to investigate how Egypt will meet electricity demand domestically and increase their energy security in the future. In addition, the biomass power plant (PWRBIO001) technology was constrained to 1.4% of 2030 electricity demand based on IRENA’s 2018 analysis to reduce its domination of Egypt’s electricity generation. These four constraints were applied to all scenarios for consistency. Input data sources for the LC scenario (and therefore the base of all other scenarios) are explained in the Model Data Sources subsection. To form the Fossil Fuel Future (FFF) scenario, a further constraint was added to the LC scenario by the removal of new capital investment into RETs. For the Net Zero by 2050 (NZ2050) scenario, historical emissions between 2015 and 2019 were averaged to calculate an assumed annual linear increase in CO 2 emissions, which was then extrapolated to peak in 2030. The peak in emissions was set to occur in 2030 as developing economies will not be able to immediately reduce their emissions. This peak value was then linearly decreased to 0 Mt by 2050. Achieving Net Zero by the year 2050 was chosen for Egypt by default due to the lack of an existing target. The ISES2035 scenario models Egypt ISES target to investigate whether the policy target is ambitious enough to achieve a CET in Egypt in the future. The ISES’s 2035 target is broken down into 14% from wind, 22% from solar PV, 3% from CSP and 2% from hydropower technologies (IRENA, 2018b). To complete this scenario, the ISES 2035 target also includes a rapid increase in coal to 16% of Egypt’s total electricity generation, and 3.3% of electricity generation from nuclear. The process of determining the breakdown of the ISES2035 target is shown in Equations 1 and 2. Equation 1 calculates the sum of electricity demand for 2035, which is then multiplied by the ISES defined percentage of a technology for 2035 in Equation 2, e.g. 22% for solar PV. This value was divided by the number of years to linearly increase the proportion of each technology to reach their respective 2035 targets. Additionally, this could be apportioned between multiple types of power plants, e.g. the 14% for wind generation was split into 60% from onshore and 40% from offshore (an assumption based on the space available in the desert and at sea). For hydropower technologies, the generation capacity input data causes the model to generate an accurate amount of electricity, as hydropower capacity is capped in Egypt at 2.8 GW due to the maximum number of dams already built on the River Nile. These values were inserted into the model to produce the minimum percentage of electricity generation required from a certain technology by 2035. A report by IRENA states that Egypt’s ISES 2035 42% renewable target should be increased to 53% of Egypt’s electricity generation to be supplied from RETs by 2030 (IRENA, 2018b). IRENA’s target is split into 4.0% hydropower, 18.4% wind, 1.4% biofuels, 21.3% solar PV and 8.3% from CSP (IRENA, 2018b). The methodology is similar to the ISES2035 scenario; however, the total electricity demand used to calculate the percentages for each technology is based on the lesser 2030 demand value rather than the 2035 value. To model a more ambitious target, the 60% by 2035 (60BY2035) scenario was created to represent a still higher proportion of electricity generation from RETs. The custom percentages of each technology are broken down as follows: 20% wind, 2% biofuels, 24% solar PV and 9% CSP (and 5% hydropower). The methodology is similar to both the ISES2035 and IRENA2030. A more detailed description of the analysis can be found online Zenodo (Gibson, 2023). The constraints for the six scenarios are summarised in Table 3. Scenario Code Scenario Name OSeMOSYS Constraints Reduced Time Slices (96 à 8) Transport Technologies Removed PWRTRNIMP Removed PWRBIO001 (Biomass) Constrained to % of 2030 demand New Investment into RETs Removed Annual Emissions Limited Production Limited per Technology LC Least Cost ✓ ✓ ✓ 1.4 FFF Fossil Fuel Future ✓ ✓ ✓ 1.4 ✓ (Geothermal, Solar PV, CSP, Hydro and Wind) NZ2050 Net Zero by 2050 ✓ ✓ ✓ 1.4 ✓ ISES2035 Renewable Integrated Sustainable Energy Strategy 2035 ✓ ✓ ✓ 1.4 ✓ (Solar PV, CSP, Wind, Biomass, Hydro, Coal, Nuclear) IRENA2030 IRENA’s REmap scenario ✓ ✓ ✓ 1.4 ✓ (Solar PV, CSP, Wind, Biomass, Hydro) 60BY2035 60% Renewables by 2035 ✓ ✓ ✓ 2.0 ✓ (Solar PV, CSP, Wind, Biomass, Hydro) Table 3. The six scenarios created using OSeMOSYS, with their respective constraints Temporal Structure Within OSeMOSYS, the energy load curve is represented by timeslices, which are defined as the time split of each modelled year. These timeslices allow the separation of periods of high or low demand, and they can be grouped into seasons or night and day. For this study each model year was represented by four seasons, each with two 12-hour components representing night and day. Reference Energy System The interactions and flow of energy between the technologies and fuels are systematically represented in the form of a Reference Energy System (RES). The RES illustrates the structure of Egypt’s energy sector (Figure 2) with the four tiers from left to right consisting of primary fuel supply, power generation technologies, transmission and distribution infrastructures and the final demand sectors (Rady et al ., 2018). Model Data Sources If specific input data could not be sourced at the national level, parameters, such as the capacity factors for power plants, were assumed to be similar to other Northern African countries and sourced from international organisations such as the International Energy Agency (IEA) and IRENA. The current energy system data, fuel costs, and transmission and distribution data were sourced from Climate Compatible Growth’s (CCG) Starter Data Kit (SDK) (Allington et al ., 2021). CCG is a UK Aid funded research programme that assists developing countries in achieving low carbon development (CCG, 2022). Included in the SDK were the estimated installed capacities for the power generation technologies, sourced from Brinkerink & Deane (2020), Brinkerink et al . (2021), Byers et al . (2018) and IRENA (2020a) for the 2018 values. Values for Egypt’s electricity transmission and distribution were sourced from Pappis et al ., 2019. Fuel price projections to 2050 were sourced from the Energy Information Administration (EIA, 2020) and IRENA 2018a. Egypt’s full country dataset, including capital fixed costs for power plants, were sourced from the SDK and is openly accessible on Zenodo (Allington et al., 2023). Renewable constraints in the scenarios were based on policies from the New and Renewable Energy Authority (NREA) (2020) and IRENA (2018a). Limitations It should be borne in mind that a model represents a simplification of reality, and cannot entirely include all considerations that impact an energy system. A significant limitation of OSeMOSYS is that variations in the climate system due to global warming are not represented in the constraints or input data. For example, an increase in temperature will negatively impact the efficiency of conventional power plants. There will also be a change to rainfall rates and distribution, impacting the electricity generation from hydropower plants (UNFCCC, 2017). In principle, OSeMOSYS can be combined with the Climate, Land, Energy and Water systems (CLEWs) model to overcome this limitation. This study was limited to Egypt’s energy sector without transport demand or electricity transmission imports. The scenario outputs have been restricted in two additional ways: 1) for the ISES2035, IRENA2030 and 60BY2035 scenarios, all solar technologies and wind technologies with storage (PWRSOL002, PWRSOL001S, PWRWND001S and PWRCSP002) have been removed as the targets outlined in ISES and IRENA’s 2018 report do not include storage technologies; and 2) energy efficiency technologies that use less fuel resources but produce the same amount of electricity have not been included due to inaccurate cost projections associated with the model’s output files. Results And Discussion Electricity Production A summary of the electricity production for the six scenarios, measured in PJ, required from each technology each year is depicted in Figure 3. In the LC scenario, interrogation of the raw data underlying the graph revealed that 26.8% of electricity production would be sourced from natural gas (CCGT and SCGT) technologies over the entire modelling period. The three wind technologies (onshore, offshore and onshore with storage) dominate the LC pathway with a contribution of 46.5%. In the FFF scenario, the electricity production is dominated by natural gas technologies and coal, with coal power plants generating 42.6% of required electricity over the modelling period. The Net Zero by 2050 scenario is dominated by wind and solar technologies with 61.3% and 36.5% respectively of electricity generated by these sources in the year 2070. The technologies required to meet Egypt’s current target of 42% electricity generation to be sourced from RETs by 2035 are also depicted in Figure 3. Over the modelling period, coal power plants generate 9.4% of Egypt’s electricity, considerably less than in the FFF scenario. For the IRENA2030 scenario over the entire modelling period, 17.5% and 3.1% of electricity generation is from solar PV plants and CSP plants respectively. Onshore wind projects produced 17.0% of electricity production across all modelled years, and offshore wind represented 10.4%. The 60BY2035 scenario, despite relying on higher levels of RETs until 2035, shows a larger proportion of coal production (9.1%) than the IRENA2030 scenario (5.0%) over the entire modelling period. Overall, fossil fuel technologies still produce 52.5% of Egypt’s electricity across all modelled years. Installed Capacity Figure 4 shows the total annual capacity in GW for the six scenarios. Overall, the amount of installed annual capacity in the FFF scenario is much lower in comparison to the LC scenario, with the system peaking at just 148 GW in the year 2070. The NZ2050 installed capacity is higher than in both FFF and LC scenarios due to the severe reduction in fossil fuel technologies, and it is dominated by the three wind technologies. For the ISES2035 scenario, solar PV represents 2,482.8 GW of the scenario’s installed capacity over the model period. This is followed by onshore wind with an installed capacity of 1,945.2 GW over the model period. The installed capacity for the 60BY2035 scenario is smaller than the ISES2035 and IRENA2030 scenarios due to the larger amount of capacity from natural gas and coal technologies. Further Findings from the FFF, LC and NZ2050 Scenario Data The FFF scenario defines the technologies that would dominate a future without capital investment into RETs. The total cost of this scenario is $2.17 trillion, which is more expensive than the renewable scenarios (ISES2035, IRENA2030 and 60BY2035) due to the high operation and maintenance (O&M) costs of input fossil fuels (Figure 5). The NZ2050 scenario defines the technologies that are required to decrease CO 2 emissions to zero by 2050 and includes the phase out of natural gas. Despite the scenario’s apparently less expensive total system cost (Figure 5), in reality it would be much more expensive due to the need for energy efficient technologies, the cost of which is not included in these results. From the NZ2050 and LC scenarios, it can be deduced that solar PV and onshore wind need to dominate Egypt’s future renewables landscape and are needed to phase out natural gas (see LC and NZ2050 charts in Figure 3). Further Findings from the ISES2035 Scenario Data The ISES2035 scenario models the government’s target of 42% of electricity generation to be sourced from RETs by 2035. The data behind Figure 5 revealed that this will cost $121.1 billion by 2035, and will save 7308.8 Mt of CO 2 emissions by 2070 compared to the FFF scenario (Appendix 1). In this scenario, solar PV will need to produce the largest amount of electricity compared to other RETs. The Egyptian government’s decision to include coal production (16%) within the ISES2035 target was based on the need to import coal to supply Egypt’s cement plants after the political instability of 2011 (Zayed & Sowers, 2014). The current government, under President El-Sisi, continues to embrace coal imports for use in industrial production, although the COP26 mandate of ‘unabated coal power phasedown’ may encourage the Egyptian government to revise this target. If the Egyptian government agreed to prevent coal production in the future in line with United Nations Framework Convention on Climate Change (UNFCCC) requirements, this could create certainty for private investment into renewable alternatives (Burki, 2022) and provide environmental and health benefits (Zayed & Sowers, 2014). Further Findings from the IRENA2030 and 60BY2035 Scenario Data An important component of ensuring a clean energy transition is increasing the proportion of electricity generation from RETs. This process is represented in the IRENA2030 and 60BY2035 scenarios. The CO 2 emissions trajectory until 2035 for the six scenarios can be found in Figure 6. Data behind Figures 5 and 6 reveals that the total system costs of the IRENA2030 scenario between 2015 and 2030 is $16.4 billion more expensive than the equivalent period for the ISES2035 scenario, but saves 110.0 Mt of CO 2 from being emitted over the same time period. Although there is a large proportion of electricity production from RETs, the results of the IRENA2030 scenario highlights the importance of continuing to extend renewable energy targets into the second half of the 21 st century. Until 2030, natural gas production (CCGT & SCGT) was decreasing to meet the 53% target; however, it increases between 2030 and 2059, and is then replaced by coal production (Figure 3). The 60BY2035 scenario represented an increase in IRENA’s analysis from 53% to 60% of electricity generation originating from RETs. By 2035, the 60BY2035 scenario will prevent 211.5 Mt of CO 2 emissions compared to the ISES2035 scenario. Overall, the 60BY2035 scenario will cost $55.3 billion more than ISES2035 (Figure 5). Despite the CO 2 emissions reduction by 2035, between 2015 and 2070 the 60BY2035 scenario produces 180.5 Mt more than ISES2035 and 912.6 Mt more than IRENA2030 (Appendix 1). This is due to significant coal production towards the end of the modelling period. A large component of achieving a CET is reaching net zero CO 2 emissions by a certain year. When reviewing all three renewable scenarios, ISES2035, IRENA2030, 60BY2035, Egypt’s energy system CO 2 emissions at 2050 are 107.3 Mt, 89.8 Mt and 104.2 Mt respectively, compared to the NZ2050 scenario reaching 0 Mt by 2050 (Appendix 2). Although the upscaling efforts of RETs for electricity production is apparent, the presence of natural gas prevents the CO 2 emissions from decreasing more significantly. This highlights the importance of phasing out fossil fuel technologies alongside upscaling RETs to successfully achieve a CET. Upscaling Renewable Energy Technologies: Private Investment and Bilateral Investment Treaties Given Egypt’s rapid population growth and subsequent increase in energy demand, private sector investment into new renewable energy projects is critical, along with transforming existing power sector structures and processes (Davies et al ., 2016; Fadly 2019). The upfront cost of upscaling RETs will rely on private investment as public funding is unlikely to supply more than 15% of the investment needed (IRENA, 2016). The capital upfront costs for the ISES2035 and IRENA2030 scenarios are $791.7 billion and $806.7 billion, respectively (Figure 5), and these will rely on financing mechanisms within the private sector. In addition to private sector investment, RET upscaling could be supported by increasing the number of bilateral investment treaties to guarantee free transfer of investments (Davies et al. , 2016). This depends on reliable governance, which is a fundamental necessity to secure both the bilateral and multilateral funding needed to develop large infrastructure projects (Hafner et al. , 2018). The large-scale deployment of renewable energy capacity in Egypt would ensure that more natural gas is available for export (which is more profitable compared to domestic use), enabling domestic demand to be met by a larger percentage of RETs (Davies et al ., 2016). Barriers to a Clean Energy Transition in Egypt Three major barriers may prevent Egypt from achieving a CET: 1) the recent discovery of natural gas reserves in the Mediterranean, 2) political instability that acts to decrease investor confidence, and 3) the need for sufficient climate finance from developed countries. According to the results of this research, natural gas is and will be a reliable source of electricity generation for Egypt. This is unlikely to change in the future due to the commissioning of the Zohr gas field in 2017, which was followed by the larger discovery of the Noor area close to the Cypriot gas fields (El Shayeb, 2020). These discoveries have helped Egypt to fill the growing domestic supply gap due to a decline in other Mediterranean fields and growing demand (Lottaroli & Meciani, 2022). Based on Egypt’s recent history of energy supply shortages, these discoveries represent future energy security and economic prosperity, and it is therefore likely Egypt will take advantage of this domestic fossil fuel production. The second barrier to achieving a CET in Egypt is political instability that impacts investor confidence. Political instability refers to both social-political unrest, such as the 2011 revolution, but also the potential for government regimes to collapse (Abdelkader, 2017). There is a strong correlation between political instability and negative economic growth, as the uncertainty associated with instability harms macroeconomic variables such as private investment (Mayer & Zhao, 2021). President El-Sisi has brought relative stability to Egypt, but recent developments such as armed clashes in the Sinai Peninsula and border tensions with Libya and Sudan may derail this stability in the future (Mayer & Zhao, 2021). The final barrier preventing Egypt from achieving a CET is a lack of sufficient climate finance from developed countries under the Paris Agreement, which is emphasised within Egypt’s NDC. In 2019, developed countries mobilised only $79.6 billion of the promised $100 billion per year, with the USA, Australia and Canada not contributing their full share (Bos et al. , 2021). The funding is broken down into four funds, with the Green Climate Fund (GCF) financing two projects in Egypt: the adaptation programme and the GCF-EBRD Egypt Renewable Energy Financing Framework with total project values of $105.2 million and $1 billion, respectively (GCF, 2022). The former aims to protect the vulnerable communities and coastline in the Nile delta, which is among the top three most vulnerable regions in the world to the impacts of climate change (GCF, 2022). The latter aims to scale up investments to support the development and construction of renewable energy projects, and will generate around 1,400 GWh electricity annually and avoid 800,000 tCO 2 e annually (GCF, 2022). For more such projects to occur in Egypt, the UNFCCC climate financing process needs to reach its maximum annual capacity. Policy Recommendations The following policy recommendations are based on the scenario results and related discussion. Short-term Integrate RETs, particularly onshore wind and solar PV, into the energy system via technical, financial and regulatory recommendations. To reduce CO 2 emissions sooner, update Egypt’s national renewable energy target from 42% by 2035 to 53% by 2030, as recommended by IRENA. To eliminate coal as a future option for Egypt, adopt the COP26 mandate of phasing out coal by introducing an energy sector ban. Long-term Based on environmental and financial analysis, extend national renewable energy targets into the second half of the 21 st century to prevent an increase in fossil fuel production. As the quantity of renewable projects increases, expand the grid as required through international bilateral projects, or financial assistance from the government. Alongside the extension of renewable targets, identify financial and regulatory mechanisms to phase out natural gas production. Conclusion This research investigated the impact on Egypt’s energy sector of upscaling renewable energy technologies to determine whether a clean energy transition will be possible in the future. Overall, the upfront cost of upscaling RETs in Egypt will be high, but the CO 2 emission reduction is needed to contribute to the prevention of global temperatures increasing above 2 o C, and it will be less costly than locking the country into a high-carbon pathway. The results showed that solar PV and onshore wind are key technologies to be upscaled to contribute towards Egypt’s CET. Furthermore, the results indicate that IRENA’s suggestion to expand Egypt’s current ISES 2035 renewables target from 42% to 53% by 2030 will cost $16.4 billion more between 2015 and 2030, saving 110.0 Mt over the same period. The overall capital investment into RETs (PV, CSP, onshore and offshore wind and hydro) for the IRENA2030 scenario is $23.6 billion more than for ISES2035. The 60% RETs by 2035 scenario would cost $56.0 billion more than IRENA’s 2030 analysis and emit more CO 2 over the entire modelling period due to the presence of coal production. Therefore, it can be concluded that IRENA’s 2030 target of 53% is the optimal renewable generation target for Egypt, based on the scenarios modelled. The success of a CET in Egypt is dependent on reducing domestic natural gas production and preventing coal production in the future. This transition will be difficult due to recent natural gas discoveries in the Mediterranean, and the challenge of achieving energy security in a rapidly changing country. Declarations Acknowledgements This paper was originally submitted as a Master’s thesis to Imperial College London and is based entirely on the author’s individual findings. The subject area of upscaling renewables within the context of Egypt was influenced by the Energy Transition Council (ETC) within the UK Government’s Business, Energy and Industrial Strategy (BEIS) department, now the Department for Energy Security and Net Zero. This material has been supported by the Climate Compatible Growth (CCG) programme, which brings together leading research organisations and is led out of the STEER centre, Loughborough University. CCG is funded by the FCDO in the UK Government. However, the views expressed herein do not necessarily reflect the UK Government's official policies. This paper was reviewed and edited by Simon Patterson (CCG, Loughborough University). U4RIA Compliance Statement This work follows the U4RIA guidelines which provide a set of high-level goals relating to conducting energy system analyses in countries. This paper was carried out involving stakeholders in the development of models, assumptions, scenarios and results (Ubuntu / Community). The authors ensure that all data, source code and results can be easily found, accessed, downloaded and viewed (retrievability), licensed for reuse (reusability), and that the modelling process can be repeated in an automatic way (repeatability). The authors provide complete metadata for reconstructing the modelling process (reconstructability), ensuring the transfer of data, assumptions and results to other projects, analyses and models (interoperability), and facilitating peer-review through transparency (auditability). CRediT Statement Zen Makuch: Supervision, Writing & Review. Rudolf Yeganyan: Methodology. Carla Cannone: Software, Validation. Naomi Tan: Software, Validation. Mark Howells: Supervision. Declaration of competing interest: The authors declare that they have no known competing financial interests or personal relationships that could have influenced the work reported in this paper. References Abdelkader, H. (2017) Political Instability and Economic Growth in Egypt. Review of Middle East Economics and Finance , 3(2), 1-12. Allington, L., Cannone, C., Pappis, I., Cervantes, K., Usher, W., Pye, S., Howells, M., Taliotis, C., Sundin, C., Sridharah, V., Ramos, E., Brinkerink, M., Deane, P. et al. (2021) Selected ‘Starter Kit’ energy system modelling data for Egypt (#CCG) . Available at: https://www.researchsquare.com/article/rs-479263/v2 [Accessed 10th June 2022]. Allington, L., Cannone, C., Pappis, I., Cervantes, K., Usher, W., Pye, S., Howells, M., Taliotis, C., Sundin, C., Sridharah, V., Ramos, E., Brinkerink, M., Deane, P. et al. (2023) CCG Starter Data Kit: Egypt . Zenodo Repository. Available at: https://zenodo.org/record/7526341#.ZBcIu3bP1Pb [Accessed 15th February 2023]. Arab Development Portal (2016) Egypt’s Vision 2030. Available at: https://arabdevelopmentportal.com/sites/default/files/publication/sds_egypt_vision_2030.pdf [Accessed 19th June 2022]. Bos, J., Gonzalez, L. & Thwaites, J. (2021) Are Countries Providing enough to the $100 billion climate finance goal? World Resources Institute. Available at: https://www.wri.org/insights/developed-countries-contributions-climate-finance-goal [Accessed 18th August 2022]. Brinkerink, M. & Deane, P. (2020) PLEXOS-World 2015 . Available at: https://dataverse.harvard.edu/dataset.xhtml?persistentId=doi:10.7910/DVN/CBYXBY [Accessed 12th June 2022]. Brinkerink, M., Gallachóir, B. & Deane, P. (2021) Building and Calibrating a Country-Level Detailed Global Electricity Model Based on Public Data. Energy Strategy Reviews , 33, 1-12 Burki, T. (2022) “Phasedown” of coal use after COP26 negotiations. The Lancet Respiratory Medicine , 10(1), 10-11. Byers, L., Friedrich, J., Hennig, A., Kressig, L., McCormick, C. & Malaguzzi, L. (2018) A Global Database of Power Plants . World Resources Institute. Available at: https://www.wri.org/publication/global-power-plant-database [Accessed 17th June 2022]. Climate Compatible Growth (CCG) (2022). About us . Available at: https://climatecompatiblegrowth.com/about-us/ [Accessed 16th June 2022]. Davies, M., Hodge, B., Ahmad, S. & Wang, Y. (2016) Developing renewable energy projects: A guide to achieving success in the Middle East . PwC and Eversheds. Available at: https://www.pwc.com/m1/en/publications/documents/eversheds-pwc-developing-renewable-energy-projects.pdf [Accessed 19th August 2022]. Daily News Egypt (2022) Egypt has $26bn development portfolio under 2030 Vision: Al-Mashat . Available at: https://dailynewsegypt.com/2022/04/23/egypt-has-26bn-development-portfolio-under-2030-vision-al-mashat/ [Accessed 19 th July 2022]. Egyptian Environmental Affairs Agency (EEAA) (2021) Summary for Policymakers: Egypt National Climate Change Strategy (NCCS) 2050 . Available at: https://www.eeaa.gov.eg/portals/0/eeaaReports/N-CC/EgyptNSCC-2050-Summary-En.pdf [Accessed 30th July 2022]. EgyptToday (2021) Overview of Egypt’s green projects within Vision 2030 . Available at: https://www.egypttoday.com/Article/3/99857/Overview-of-Egypt-s-green-projects-within-Vision-2030 [Accessed 14th July 2022]. Energy Information Administration (EIA) (2020) Annual Energy Outlook 2020 with projections to 2050 . Energy Information Administration. Available at: https://www.eia.gov/outlooks/aeo/pdf/AEO2020%20Full%20Report.pdf [Accessed 18 th June 2022]. El Shayeb, H., Abdel-Gawad, G., Noah, A., Abuelhasan, M. & Ataallah, M. (2020) Comparative study between density porosity and density magnetic resonance porosity: a case study of Sequoia gas reservoir, Mediterranean offshore gas, Egypt. Arabian Journal of Geosciences , 13 (8), 1-8. European Union (EU) (2015) ‘Integrated Sustainable Energy Strategy’ for Technical Assistance to Support the Reform of the Energy Sector (TARES) , European Delegation of the European Union to Egypt. Available at: https://eeas.europa.eu/archives/delegations/egypt/press_corner/all_news/news/2016/20160718_en.pdf [Accessed 18th June 2022]. Fadly, D. (2019) Low-carbon transition: Private sector investment in renewable energy projects in developing countries. World Development , 122, 552-569. Gardumi, F., Shivakumar, A., Morrison, R., Taliotis, C., Broad, O., Beltramo, A., Sridharan, V., Howells, M., Hörsch, J., Niet, T., Almulla, Y., Ramos, E., Burandt, T. et al. (2018) From the development of an open-source energy modelling tool to its application and the creation of communities of practice: The example of OSeMOSYS. Energy Strategy Reviews , 20, 209-228. Gardumi, F., Welsch, M., Howells, M. & Emanuela, C. (2019) Representation of Balancing Options for Variable Renewables in Long-Term Energy System Models: An Application to OSeMOSYS. Energies , 12 (12), 2366-2388. Gibson, A. (2023) CCG Egypt Scenarios . Zenodo Repository. Available at: https://doi.org/10.5281/zenodo.7743874 [Accessed 17th March 2023]. Green Climate Fund (GCF) (2022) GCF-EBRD Egypt Renewable Energy Financing Framework . Available at: https://www.greenclimate.fund/project/fp039 [Accessed 19th August 2022]. Hafner, M., Tagliapietra, S. & de Strasser, L. (2018) Prospects for Renewable Energy in Africa. In : Energy in Africa Challenges and Opportunities . Switzerland, Springer International Publishing, 47-73. Howells, M., Rogner, H., Roehrl, A., Strachan, N., Heaps, C., Huntington, H., Kypreos, S., Hughes, A., Silveira, S., Decarolis, J. & Bazillian, M. (2011) OSeMOSYS: The Open Source Energy Modelling System An introduction to its ethos, structure and development. Energy Policy , 39(10), 5850-5870. IEA (2022) Egypt . International Energy Agency. Available at: https://www.iea.org/countries/egypt [Accessed 14th May 2022]. International Renewable Energy Agency (IRENA) (2016) Unlocking Renewable Energy Investment: The Role of Risk Mitigation and Structured Finance . International Renewable Energy Agency. Available at: https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2016/IRENA_Risk_Mitigation_and_Structured_Finance_2016.pdf [Accessed 19th August 2022]. IRENA (2018a) Planning and Prospects for Renewable Power: West Africa . Available at: https://www.irena.org/publications/2018/Nov/Planning-and-prospects-for-renewable-power [Accessed 10th July 2022]. IRENA (2018b) Renewable Energy Outlook Egypt . International Renewable Energy Agency. Available at: https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2018/Oct/IRENA_Outlook_Egypt_2018_En.pdf [Accessed 20th June 2022]. IRENA (2020a) Renewable Energy Statistics 2020 . The International Renewable Energy Agency. Available at: https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2020/Jul/IRENA_Renewable_Energy_Statistics_2020.pdf [Accessed 18th June 2022]. Löffler, K., Hainsch, K., Burandt, T., Oei, P., Kemfert, C. & von Hirschhausen, C. (2017) Designing a Model for the Global Energy System – GENeSYS-MOD: An Application of the Open-Source Energy Modelling System (OSeMOSYS). Energies , 10, 1-28. Lottaroli, F. & Meciani, L. (2022) The rejuvenation of hydrocarbon exploration in the Eastern Mediterranean. Petroleum Geoscience , 28(1), 1-17. Mayer, M. & Zhao, Y. (2021) Do Political Instability and Military Expenditure Undermine Economic Growth in Egypt? Evidence from the ARDL Approach. Defence and Peace Economics , 1-24. Moksnes, N., Welsch, M., Gardumi, F., Shivakumar, A., Broad, O., Howells, M., Taliotis, C. & Sridharan, V. (2015) 2015 OSeMOSYS User Manual . KTH Royal Institute of Technology. Available at: http://www.osemosys.org/uploads/1/8/5/0/18504136/new-website_osemosys_manual_-_working_with_text_files_-_2015-11-05.pdf [Accessed 14th May 2022]. Mondal, M., Ringler, C., Al-Riffai, P., Eldidi, H., Breisinger, C. & Wiebelt, M. (2018) Long-term optimisation of Egypt’s power sector: Policy implications. Energy , 166, 1063-1073. New and Renewable Energy Authority (NREA) (2020) Annual Report – 2020 . New and Renewable Energy Authority. Available at: http://nrea.gov.eg/Content/reports/Annual%20Report%202020%20En.pdf [Accessed 15 th June 2022]. Pappis, I., Howells, M., Sridharan, V., Usher, W., Shivakumar, A., Gardumi, F. & Ramos, E. (2019) Energy projections for African countries . Joint Research Centre Technical Report. Available at: https://www.researchgate.net/profile/Ioannis-Pappis/publication/337154878_Energy_projections_for_African_countries/links/5dc847e3a6fdcc57503dd5c1/Energy-projections-for-African-countries.pdf [Accessed 19th June 2022]. Rady, Y., Rocco, M., Serag-Eldin, M. & Colombo, E. (2018) Modelling for power generation sector in Developing Countries: Case of Egypt. Energy , 165, 198-209. Taliotis, C., Shivakumar, A., Ramos, E., Howells, M., Mentis, D., Sridharan, V., Broad, O. & Mofor, L. (2016) An indicative analysis of investment opportunities in the African electricity supply sector – Using TEMBA (The Electricity Model Base for Africa). Energy For Sustainable Development , 31, 50-66. Taliotis, C., Rogner, H., Ressl, S., Howells, M. & Gardumi, F. (2017) Natural Gas in Cyprus: the need for consolidated planning. Energy Policy , 107, 197-209. UK Government (2022) COP26 Energy Transition Council: 2022 Strategic Priorities . UK Government. Available at: https://www.gov.uk/government/publications/cop26-energy-transition-council-2022-strategic-priorities/cop26-energy-transition-council-2022-strategic-priorities#strategic-priorities [Accessed 24th October 2022]. United Nations Development Programme (UNDP) (2018) Sustainable Development Goals Report: Egypt 2030 . Available at: https://www.undp.org/sites/g/files/zskgke326/files/migration/eg/Sustainable-Development-Goals-Report.-Egypt-2030.pdf [Accessed 4th June 2022]. UNFCCC (n.d.) Intended Nationally Determined Contribution from the Plurinational State of Bolivia. Available at: https://www.un.org/development/desa/dpad/wp-content/uploads/sites/45/post/INDC-Bolivia-english.pdf [Accessed 18th June 2022]. UNFCCC (2017) Egyptian Intended Nationally Determined Contribution . United Nations Convention on Climate Change. Available at: https://unfccc.int/sites/default/files/ NDC/2022-06/Egyptian%20INDC.pdf [Accessed 19 th April 2022]. UNFCCC (2022) Egypt’s First Updated Nationally Determined Contributions. United Nations Convention on Climate Change. Available at: https://unfccc.int/sites/default/files/NDC/2022-07/Egypt%20Updated%20NDC.pdf.pdf [Accessed 17 th July 2022]. World Bank (2019) Maximising finance for development in Egypt’s energy sector . Available at: https://documents1.worldbank.org/curated/en/780061567532224696/pdf/Maximizing-Finance-for-Development-in-Egypts-Energy-Sector.pdf [Accessed 8th June 2022]. World Bank (2021a) Middle East and North Africa . World Bank Group. Available at: https://www.worldbank.org/en/region/mena/overview#1 [Accessed 3 rd July 2022]. World Bank (2021b) Unemployment, total (% of labour force – Egypt, Arab Rep . Available at: https://data.worldbank.org/indicator/SL.UEM.TOTL.ZS?locations=EG [Accessed 5 th May 2022]. World Bank Group (2021) Egypt, Arab Rep. World Bank Group. Available at: https://data.worldbank.org/country/EG [Accessed 19th July 2022]. Zayed, D. & Sowers, J. (2014) The Campaign Against Coal in Egypt . Middle East Report , 271 29-35. Supplementary Files Appendix1..png Appendix 1. The carbon dioxide emissions for all scenarios over the modelling period. Appendix2..png Appendix 2. Custom carbon dioxide emissions for the Net Zero scenario 2050. Cite Share Download PDF Status: Posted Version 4 posted You are reading this latest preprint version Show more versions Research Square lets you share your work early, gain feedback from the community, and start making changes to your manuscript prior to peer review in a journal. As a division of Research Square Company, we’re committed to making research communication faster, fairer, and more useful. We do this by developing innovative software and high quality services for the global research community. Our growing team is made up of researchers and industry professionals working together to solve the most critical problems facing scientific publishing. Also discoverable on Platform About Our Team In Review Editorial Policies Advisory Board Help Center Resources Author Services Accessibility API Access RSS feed Manage Cookie Preferences © Research Square 2026 | ISSN 2693-5015 (online) Privacy Policy Terms of Service Do Not Sell My Personal Information {"props":{"pageProps":{"initialData":{"identity":"rs-2526010","acceptedTermsAndConditions":true,"allowDirectSubmit":true,"archivedVersions":[],"articleType":"Research Article","associatedPublications":[],"authors":[{"id":187901479,"identity":"8e3868e8-504d-4b7b-b43a-f966c2b219f6","order_by":0,"name":"Anna Gibson","email":"data:image/png;base64,iVBORw0KGgoAAAANSUhEUgAAAZAAAAAyAQMAAABI0h/eAAAABlBMVEX///8AAABVwtN+AAAACXBIWXMAAA7EAAAOxAGVKw4bAAABCUlEQVRIiWNgGAWjYNACgwNAgvnggw8VNkAGY+MBIrWwJRvOOJMG0tJAhBYGkBoeM2netsNwLk7AP7v34McvBXfs+aUbDCR42M7brW0/DLSlxiYalxaJO+eSpWUMniXOnHMgAajndvK2M4lALcfSchtw6bmRYyAtYXA4weBGAkjP7WSzA0AtjA2HcWqRv5Fj/Buoxd7gBlBlgsG5ZLPzD/FrMbiRYyb5weAw44YbycCQSjhgZ3aDgC2GQC3WDCC/zEhjBupJTjC7AbQlAY9f5IAOu/njDzDEJPK///77z87e7Hz6wwcfamxwex8ImHmQOIlglQl4lIMA4w8kjj0BxaNgFIyCUTACAQBXS2vjCQsVXgAAAABJRU5ErkJggg==","orcid":"","institution":"Imperial College London","correspondingAuthor":true,"submittingAuthor":false,"prefix":"","firstName":"Anna","middleName":"","lastName":"Gibson","suffix":""},{"id":194322207,"identity":"9ce88e47-7912-489a-80dc-6fa6a098af1a","order_by":1,"name":"Zen Makuch","email":"","orcid":"","institution":"Imperial College London","correspondingAuthor":false,"submittingAuthor":false,"prefix":"","firstName":"Zen","middleName":"","lastName":"Makuch","suffix":""},{"id":194322208,"identity":"02ee505c-834c-4c84-95d6-94541a01af44","order_by":2,"name":"Rudolf Yeganyan","email":"","orcid":"","institution":"Imperial College London, Loughborough University","correspondingAuthor":false,"submittingAuthor":false,"prefix":"","firstName":"Rudolf","middleName":"","lastName":"Yeganyan","suffix":""},{"id":194322209,"identity":"c0b064e2-d679-4811-ac30-95826fcaa573","order_by":3,"name":"Naomi Tan","email":"","orcid":"","institution":"Imperial College London, Loughborough University","correspondingAuthor":false,"submittingAuthor":false,"prefix":"","firstName":"Naomi","middleName":"","lastName":"Tan","suffix":""},{"id":194322210,"identity":"e74581c0-2d50-40c2-92e2-209e521c0b40","order_by":4,"name":"Carla Cannone","email":"","orcid":"","institution":"Imperial College London, Loughborough University","correspondingAuthor":false,"submittingAuthor":false,"prefix":"","firstName":"Carla","middleName":"","lastName":"Cannone","suffix":""},{"id":194322211,"identity":"ea017c58-df6a-4ed4-a829-c11d68b633d0","order_by":5,"name":"Mark Howells","email":"","orcid":"","institution":"Imperial College London, Loughborough University","correspondingAuthor":false,"submittingAuthor":false,"prefix":"","firstName":"Mark","middleName":"","lastName":"Howells","suffix":""}],"badges":[],"createdAt":"2023-01-29 11:19:42","currentVersionCode":4,"declarations":{"humanSubjects":false,"vertebrateSubjects":false,"conflictsOfInterestStatement":true,"humanSubjectEthicalGuidelines":false,"humanSubjectConsent":false,"humanSubjectClinicalTrial":false,"humanSubjectCaseReport":false,"vertebrateSubjectEthicalGuidelines":false,"coiExplicitlySet":false},"doi":"10.21203/rs.3.rs-2526010/v4","doiUrl":"https://doi.org/10.21203/rs.3.rs-2526010/v4","draftVersion":[],"editorialEvents":[],"editorialNote":"","failedWorkflow":false,"files":[{"id":36235575,"identity":"38d18a50-17bb-42a5-a6e4-1410ddfbeae9","added_by":"auto","created_at":"2023-04-24 17:59:20","extension":"png","order_by":1,"title":"Figure 1","display":"","copyAsset":false,"role":"figure","size":120606,"visible":true,"origin":"","legend":"\u003cp\u003e\u003cem\u003eThe breakdown of electricity generation sources for 2035. Source: NREA, 2020.\u003c/em\u003e\u003c/p\u003e","description":"","filename":"Figure1..png","url":"https://assets-eu.researchsquare.com/files/rs-2526010/v4/9c492187af2c12b16eb64490.png"},{"id":36235501,"identity":"8c8a6707-4ea3-45ea-84f4-bb132daec25e","added_by":"auto","created_at":"2023-04-24 17:51:20","extension":"png","order_by":2,"title":"Figure 2","display":"","copyAsset":false,"role":"figure","size":167636,"visible":true,"origin":"","legend":"\u003cp\u003e\u003cem\u003eEgypt’s Reference Energy System. PP = Power Plant, LFO = Light Fuel Oil. Created with Lucid Chart based on the Starter Data Kit RES in Allington et al., 2021.\u003c/em\u003e\u003c/p\u003e","description":"","filename":"Figure2..png","url":"https://assets-eu.researchsquare.com/files/rs-2526010/v4/a5e50fec81dfbf642dc1e38c.png"},{"id":36234950,"identity":"aa0bd93d-5929-491d-bb4f-5fc989ce12c7","added_by":"auto","created_at":"2023-04-24 17:35:20","extension":"png","order_by":3,"title":"Figure 3","display":"","copyAsset":false,"role":"figure","size":102111,"visible":true,"origin":"","legend":"\u003cp\u003e\u003cem\u003eElectricity production (PJ) for all six scenarios.\u003c/em\u003e\u003c/p\u003e","description":"","filename":"Figure3...png","url":"https://assets-eu.researchsquare.com/files/rs-2526010/v4/40e10b58ec1c6a6c1e199958.png"},{"id":36235167,"identity":"6df61fe2-8c62-4d56-8c2e-124ae143c973","added_by":"auto","created_at":"2023-04-24 17:43:20","extension":"png","order_by":4,"title":"Figure 4","display":"","copyAsset":false,"role":"figure","size":96355,"visible":true,"origin":"","legend":"\u003cp\u003e\u003cem\u003eTotal annual capacity (GW) for all six scenarios.\u0026nbsp;\u003c/em\u003e\u003c/p\u003e","description":"","filename":"Figure4..png","url":"https://assets-eu.researchsquare.com/files/rs-2526010/v4/0231c1a45bc02d6c746e51ff.png"},{"id":36235576,"identity":"07ecf827-9f2d-43e6-ab57-dae6794675c7","added_by":"auto","created_at":"2023-04-24 17:59:20","extension":"png","order_by":5,"title":"Figure 5","display":"","copyAsset":false,"role":"figure","size":23694,"visible":true,"origin":"","legend":"\u003cp\u003e\u003cem\u003eTotal System Costs ($) for all six scenarios.\u0026nbsp;\u003c/em\u003e\u003c/p\u003e","description":"","filename":"Figure5..png","url":"https://assets-eu.researchsquare.com/files/rs-2526010/v4/2c010c913f0df4e0ce92da8d.png"},{"id":36235502,"identity":"d117ba21-c38b-4a25-a9fb-136d4b5d040e","added_by":"auto","created_at":"2023-04-24 17:51:20","extension":"png","order_by":6,"title":"Figure 6","display":"","copyAsset":false,"role":"figure","size":38263,"visible":true,"origin":"","legend":"\u003cp\u003e\u003cem\u003eCO\u003c/em\u003e\u003csub\u003e\u003cem\u003e2\u003c/em\u003e\u003c/sub\u003e\u003cem\u003e emissions (Mt) trajectory for the six scenarios between 2015 and 2035.\u003c/em\u003e\u003c/p\u003e","description":"","filename":"Figure6..png","url":"https://assets-eu.researchsquare.com/files/rs-2526010/v4/76a60e7f345134c5d34878b9.png"},{"id":36235620,"identity":"383ea75e-dc6d-4768-ad68-c4b826afb989","added_by":"auto","created_at":"2023-04-24 17:59:32","extension":"pdf","order_by":0,"title":"","display":"","copyAsset":false,"role":"manuscript-pdf","size":719786,"visible":true,"origin":"","legend":"","description":"","filename":"manuscript.pdf","url":"https://assets-eu.researchsquare.com/files/rs-2526010/v4/ec487e52-8de6-4616-9680-9ac69d4af870.pdf"},{"id":36234954,"identity":"9e8a00c7-67a9-4615-a6ae-2cadb080fb2b","added_by":"auto","created_at":"2023-04-24 17:35:20","extension":"png","order_by":1,"title":"","display":"","copyAsset":false,"role":"supplement","size":38588,"visible":true,"origin":"","legend":"\u003cp\u003e\u003cem\u003eAppendix 1. The carbon dioxide emissions for all scenarios over the modelling period.\u003c/em\u003e\u003c/p\u003e","description":"","filename":"Appendix1..png","url":"https://assets-eu.researchsquare.com/files/rs-2526010/v4/38e5df2b58bf0cb15756d23f.png"},{"id":36235165,"identity":"6b3f59a9-fdd0-4fa0-b785-9a079b4e3c67","added_by":"auto","created_at":"2023-04-24 17:43:20","extension":"png","order_by":2,"title":"","display":"","copyAsset":false,"role":"supplement","size":22604,"visible":true,"origin":"","legend":"\u003cp\u003e\u003cem\u003eAppendix 2. Custom carbon dioxide emissions for the Net Zero scenario 2050.\u003c/em\u003e\u003c/p\u003e","description":"","filename":"Appendix2..png","url":"https://assets-eu.researchsquare.com/files/rs-2526010/v4/424b76624bbdb6d1025cc36a.png"}],"financialInterests":"","formattedTitle":"\u003cp\u003eLong-term Energy System Modelling for a Clean Energy Transition in Egypt's Energy Sector\u003c/p\u003e","fulltext":[{"header":"Introduction","content":"\u003cp\u003eLong-term energy system modelling can assist our understanding of how countries might transition towards clean energy systems. Egypt, a lower middle-income country, has one of the largest economies within the Middle East and North Africa (MENA) region (World Bank, 2021a). According to the World Bank Group, Egypt\u0026rsquo;s population is projected to grow to 122.6 million by 2030 from 109.3 million in 2021 (2021), placing pressure on the nation\u0026rsquo;s economy (UNDP, 2018).\u003c/p\u003e\n\u003cp\u003eLarge fossil fuel subsidies in the early 2010s discouraged investment in the power sector (World Bank, 2019). These subsidies, a decline in production and an increase in demand meant that the energy sector could no longer meet the demands of the growing population, resulting in severe power shortages and blackouts (World Bank, 2019). Previous political instability, such as the Arab Spring social unrest beginning in 2011, resulted in an unemployment rate of 13.1% in 2013, further exacerbating the economic situation (World Bank, 2021b). Following this, the ensuing recession caused Egypt to transition from an energy exporter in 2009 to an energy importer by 2014 (World Bank, 2019). To tackle this, the government implemented ambitious reforms in 2016, designed to restore political and macroeconomic stability, which included raising taxes, reducing fossil fuel energy subsidies, and introducing feed-in tariffs to promote renewable energy production (UNDP, 2018; IEA, 2022). These efforts have resulted in a significant increase in investment, boosting electricity production (IEA, 2022).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eCurrently, Egypt is heavily dependent on fossil fuels for electricity production, primarily natural gas, which are supplemented by renewable resources such as hydropower, wind and solar photovoltaics (PV). Due to Egypt\u0026rsquo;s climate, the country is suitable for both wind (onshore and offshore) and solar PV and concentrated solar power (CSP). Egypt receives between 2,900\u0026ndash;3,200 hrs of sunshine annually with total radiation intensity varying between 2,000 and 3,200 kWh/m\u003csup\u003e2\u003c/sup\u003e/year (IRENA, 2018b). Egypt is also suitable for harnessing wind energy with stable wind speeds between 8\u0026ndash;10 m/s at 100 m in the Gulf of Suez area (IRENA, 2018b). Progress has been made with the building of large renewable projects such as the Benban Solar PV Park, Kom Ombo Solar PV plant and Zaafarana Wind Farm.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eEgypt\u0026rsquo;s current climate policies need substantial updates to be consistent with the Paris Agreement\u0026rsquo;s 1.5\u003csup\u003eo\u003c/sup\u003eC target, such as including a quantifiable emissions reduction target within its Nationally Determined Contribution (NDC). In 2016, Egypt set a target of 42% of electricity generation to be sourced from renewable technologies by 2035 as outlined in its Integrated Sustainable Energy Strategy (ISES) (EU, 2015; IRENA, 2018b; NREA, 2020).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eTo investigate Egypt\u0026rsquo;s potential pathway towards a clean energy transition (CET), three research objectives were set. They were:\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e1) To generate six scenarios that investigate the impact of upscaling RETs on Egypt\u0026rsquo;s energy system using the long-term energy system model OSeMOSYS.\u003c/p\u003e\n\u003cp\u003e2) To determine the technologies and policies that are required to ensure a CET.\u003c/p\u003e\n\u003cp\u003e3) To identify the main economic and socio-political barriers that may prevent Egypt from achieving a CET.\u003c/p\u003e"},{"header":"Literature Review","content":"\u003cp\u003e\u003cem\u003eCurrent Egyptian Energy Policies\u0026nbsp;\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eDespite the lack of a quantitative target for reducing CO\u003csub\u003e2\u003c/sub\u003e emissions, sectors within Egypt are working towards a CET guided by strategies such as the Integrated Sustainable Energy Strategy (ISES) for 2035, Vision 2030 (Arab Development Portal, 2016) and the National Climate Change Strategy 2050 (NCCS) (EEAA, 2021).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe ISES 2035 was initiated by the Egyptian Government in 2013 through a project funded by the European Union (EU, 2015). The strategy primarily aims to rapidly increase the use of renewable energy technologies (RETs) and to improve energy efficiency in the energy sector (IRENA, 2018b). The most quantifiable renewable energy targets within this strategy are 20% of electricity generation to be sourced from RETs by 2022 and 42% by 2035; the latter is broken down into different technologies as shown in Figure 1. It also includes plans to increase Egypt\u0026rsquo;s electricity generation from coal to 16% by 2035, up from 0% currently (NREA, 2020).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eAnalysis of Egypt\u0026rsquo;s renewable target by the International Renewable Energy Agency (IRENA) in 2018 classified the ISES 2035 target as unambitious. IRENA\u0026rsquo;s scenario suggests that 53% of Egypt\u0026rsquo;s electricity generation should be sourced from RETs by 2030 (IRENA, 2018b). This target has been deemed economically feasible due to the financial mechanisms in place for renewable projects such as the Build Own Operate (BOO) schemes and bilateral foreign investment agreements into renewable projects (IRENA, 2018b).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eEgypt\u0026rsquo;s Vision 2030 aims to find a pathway to economic and social justice which will revive the role of Egypt in regional leadership (Arab Development Portal, 2016). At present, 30% of the total planned projects are underway, with plans for 50% by June 2025. Prominent green projects include the Benban Solar PV, wastewater treatment plants, and the desalination project at El Dabaa (EgyptToday, 2021). Most recently, a development cooperation portfolio of $26 billion is set to fund 372 ongoing projects under Vision 2030 in various sectors that are aligned with the SDGs (Daily News Egypt, 2022).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe recently published NCCS 2050 addresses climate change impacts, and it aims to (1) improve the quality of life for Egyptian citizens, (2) achieve sustainable development and economic growth, and (3) strengthen Egypt\u0026rsquo;s leadership at the international level (EEAA, 2021). The NCCS 2050 emphasises integrated action between strategies and sectors, utilising financing opportunities under the Paris Agreement from international sources, such as the Green Climate Fund (GCF) and the World Bank, and strengthening international bilateral and multilateral cooperation (EEAA, 2021).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eAt the international level, Egypt ratified the Paris Agreement in 2017 and its NDC action plan aims to develop policy targets that rely on five main pillars: the efficient use of energy, the increased use of renewable energy, the use of locally appropriate and more efficient fossil fuel technologies (including nuclear), the use of energy efficiency to decouple energy demand and economic growth, and the reform of energy subsidies (UNFCCC, 2017). Overall, the NDC stresses the importance of international financial assistance to develop policy targets and focuses on qualitative mitigation and adaptation measures; but it fails to mention a quantifiable CO\u003csub\u003e2\u003c/sub\u003e or GHG reduction target, or a net zero target. An update to Egypt\u0026rsquo;s NDC in June 2022 also did not provide any quantifiable targets (UNFCCC, 2022).\u003c/p\u003e\n\u003cp\u003e\u003cem\u003ePrevious Modelling Work\u0026nbsp;\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eNational-scale examples of previous OSeMOSYS modelling projects include the examination of Cyprus\u0026rsquo; natural gas outlook (Taliotis \u003cem\u003eet al\u003c/em\u003e., 2017) and meeting Bolivia\u0026rsquo;s Intended Nationally Determined Contribution (INDC) (UNFCCC, n.d.). Larger scale projects include The Electricity Model Base for Africa (TEMBA) study, which investigated the electricity supply systems of 47 countries and generated a 2040 scenario that showed how an enhanced grid network can alter Africa\u0026rsquo;s generation mix and reduce electricity generation costs (Taliotis \u003cem\u003eet al.\u003c/em\u003e, 2016). OSeMOSYS analysis has been expanded to the global scale in a study that used the GENeSYS-MOD Global Energy System Model to assess the feasibility of global decarbonisation pathways and concluded that a reorientation of the energy system would be driven by decreasing costs of renewable energy sources, leading to the phase out of fossil fuels (L\u0026ouml;ffler \u003cem\u003eet al\u003c/em\u003e., 2017).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003ePrevious modelling studies have been conducted for Egypt using both OSeMOSYS and other long term energy system models. A key study by Mondal \u003cem\u003eet al\u003c/em\u003e. used the TIMES energy system model to examine Egypt\u0026rsquo;s energy policy goals as reflected in Egypt\u0026rsquo;s Vision 2030 (2018). This study concluded that the current supply of energy needs to diversify from predominantly natural gas to a mix of technologies, and that it may be wise to target promotion of renewable energy for power generation and to develop a low-carbon society (Mondal \u003cem\u003eet al\u003c/em\u003e., 2018). This study included a renewable energy development scenario based on Vision 2030. In comparison, the study described here is based on ISES 2035 targets and IRENA\u0026rsquo;s proposed modifications. Rady \u003cem\u003eet al.\u003c/em\u003e\u0026rsquo;s paper used OSeMOSYS to model Egypt\u0026rsquo;s power generation sector and to provide policymakers with information to better plan for future investments in the power sector (2018). It concluded that the lowest cost electricity generation mix always includes hydropower, natural gas-fired steam cycles, wind power and solar PV rooftop technologies (Rady \u003cem\u003eet al\u003c/em\u003e., 2018). This study focused on the analysis of two different energy demand scenarios and did not investigate increasing renewable energy technologies for power generation in Egypt.\u0026nbsp;\u003c/p\u003e"},{"header":"Experimental","content":"\u003cp\u003eThe Open-Source Energy Modelling System (OSeMOSYS) was used to define a long-term decarbonisation strategy for Egypt\u0026rsquo;s energy sector. OSeMOSYS is a dynamic, bottom-up, multi-year energy system model that applies linear optimisation techniques to determine an array of least-cost technologies to satisfy a defined energy demand. It uses energy system parameters sourced from international and national datasets, and these were constrained to generate six scenarios. The scenario outputs were analysed against the criteria of CO\u003csub\u003e2\u003c/sub\u003e emissions and cost to determine a pathway towards a CET for Egypt\u0026rsquo;s energy sector.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe model is driven to satisfy an exogenously defined energy demand, which can be achieved through a combination of technologies and fuels (Taliotis \u003cem\u003eet al\u003c/em\u003e., 2016). A \u0026lsquo;technology\u0026rsquo; in OSeMOSYS has a flexible definition and can comprise of any fuel use and conversion, from resource extraction and processing to generation, transmission and distribution, as well as appliances (Moksnes \u003cem\u003eet al\u003c/em\u003e., 2015). A \u0026lsquo;technology\u0026rsquo; is intended as a black-box with user-defined transfer functions and characteristics, alongside fuels that represent any energy vector, energy service or proxy entering or exiting a technology, such as an input of natural gas and output of electricity for a natural gas power plant (Gardumi \u003cem\u003eet al\u003c/em\u003e., 2018). The technologies and fuels represented in this modelling are shown in Table 1.\u003c/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c/p\u003e\n\u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u003cem\u003eTable 1. The power plant technologies and corresponding fuels (under commodities) used in this study. Source: OSeMOSYS Model Sets Tab.\u0026nbsp;\u003c/em\u003e\u003c/p\u003e\n\u003ctable style=\"width: 4.5e+2pt;border: none;border-collapse:collapse;\"\u003e\n \u003ctbody\u003e\n \u003ctr\u003e\n \u003ctd colspan=\"2\" style=\"width: 211.5pt;border: 1pt solid windowtext;background: rgb(222, 235, 246);padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:center;'\u003e\u003cstrong\u003e\u003cspan style=\"color:black;\"\u003eTechnologies\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:center;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd colspan=\"2\" style=\"width: 204.6pt;border-color: windowtext windowtext windowtext currentcolor;border-style: solid solid solid none;border-width: 1pt 1pt 1pt medium;border-image: none 100% / 1 / 0 stretch;background: rgb(222, 235, 246);padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:center;'\u003e\u003cstrong\u003e\u003cspan style=\"color:black;\"\u003eCommodities\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;background: rgb(222, 235, 246);padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u003cspan style=\"color:black;\"\u003eCode\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;background: rgb(222, 235, 246);padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u003cspan style=\"color:black;\"\u003eDescription\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;background: rgb(222, 235, 246);padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u003cspan style=\"color:black;\"\u003eCode\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: windowtext windowtext windowtext currentcolor;border-style: solid solid solid none;border-width: 1pt 1pt 1pt medium;border-image: none 100% / 1 / 0 stretch;background: rgb(222, 235, 246);padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u003cspan style=\"color:black;\"\u003eDescription\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRBIO001\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eBiomass Power Plant\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eOIL\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eCrude Oil\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRCOA001\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eCoal Power Plant\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eBIO\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eBiomass\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRGEO\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eGeothermal Power Plant\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eCOA\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eCoal\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 28.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWROHC001\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eLight Fuel Oil Power Plant\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 28.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 28.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eLFO\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eLight Fuel Oil\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 40.1pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWROHC002\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 40.1pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eOil Fired Gas Turbine (Simple Cycle Gas Turbine (SCGT))\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 40.1pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 40.1pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 40.1pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eNGS\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 40.1pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eNatural Gas\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 39.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRNGS001\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 39.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eGas Power Plant (Combined Cycle Gas Turbine (CCGT))\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 39.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 39.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 39.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eHFO\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 39.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eHeavy Fuel Oil\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRNGS002\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eGas Power Plant (SCGT)\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eSOL\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eSolar\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRSOL001\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eSolar PV (Utility)\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eHYD\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eHydropower\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRSOL002\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eSolar PV (Distributed with Storage)\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eWND\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eWind\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRCSP001\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eCSP without Storage\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eURN\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eUranium\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRCSP002\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eCSP with Storage\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eGEO\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eGeothermal\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRHYD001\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eLarge Hydropower Plant (Dam) (\u0026gt;100MW)\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eELC001\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eElectricity from Power Plants\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRHYD002\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eMedium Hydropower Plant (10-100MW)\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eELC002\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eElectricity after Transmission\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 18.35pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRHYD003\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 18.35pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eSmall Hydropower Plant (\u0026lt;10MW)\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 18.35pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;border-color: currentcolor windowtext currentcolor currentcolor;border-style: none solid none none;border-width: medium 1pt medium medium;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 18.35pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 18.35pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003eELC003\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 18.35pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eElectricity after Distribution\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRHYD004\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eOff-grid Hydropower\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;padding: 0in 5.4pt;height: 17.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;border: medium none;padding: 0in 5.4pt;height: 17.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;border: medium none;padding: 0in 5.4pt;height: 17.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRWND001\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eOnshore Wind\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRWND002\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eOffshore Wind\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRNUC\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eNuclear Power Plant\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;padding: 0in 5.4pt;height: 17.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRSOL001S\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eUtility-scale PV with 2-hour Storage\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;padding: 0in 5.4pt;height: 28.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.75pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 28.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003ePWRWND001S\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 125.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 28.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eOnshore Wind Power Plant with Storage\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 17.1pt;border: medium none;padding: 0in 5.4pt;height: 28.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 21.45pt;padding: 0in 5.4pt;height: 28.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 49.95pt;padding: 0in 5.4pt;height: 28.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 154.6pt;padding: 0in 5.4pt;height: 28.3pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003c/tbody\u003e\n\u003c/table\u003e\n\u003cp\u003e\u003cbr\u003e\u003c/p\u003e\n\u003cp\u003eIn short, OSeMOSYS prioritises the least-cost pathway formed from technologies to determine a country or region\u0026rsquo;s future energy mix (Howells\u003cem\u003e\u0026nbsp;et al.\u003c/em\u003e, 2011). An optimal least-cost approach is useful for operational analysis of variable and fixed costs of both short-term upfront capital costs and long-term investment plans (Gardumi \u003cem\u003eet al\u003c/em\u003e., 2019). Due to the model\u0026rsquo;s open-source nature,\u0026nbsp;the input data\u0026nbsp;is ideally free\u0026nbsp;and publicly available. This overcomes a significant barrier when modelling the energy systems of countries with developing economies, as access to data has previously been proven to delay the decision-making process (Allington \u003cem\u003eet al.\u003c/em\u003e, 2021). OSeMOSYS has a user-friendly Excel-based graphical user interface: the parameters are inputted via Climate Compatible Growth\u0026rsquo;s (CCG) Simple and Nearly Done (clicSAND) interface to generate a *csv Excel output file. A combination of accessibility and transparency made OSeMOSYS an appropriate model to use in this research. A thorough description of the methodology on how to run the model and use the clicSAND interface can be found on Zenodo (Gibson, 2023).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u003cem\u003eConstraints\u0026nbsp;\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eTechnical constraints, emission limits or economic realities can be applied to the technologies within the model to generate scenarios or to reflect operational requirements, governmental policies or socio-economic realities (Taliotis \u003cem\u003eet al\u003c/em\u003e., 2016). These constraints can include altering the relationship between different types of energy inputs and outputs, placing upper limits on GHG emissions, lower limits on renewable generation or upper and lower limits on financial investment (Gardumi \u003cem\u003eet al\u003c/em\u003e., 2018). Several constraints were used to generate the six scenarios, explained in the following subsection.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u003cem\u003eScenarios\u0026nbsp;\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eTo investigate the impact of upscaling RETs for Egypt\u0026rsquo;s CET, six scenarios were modelled for Egypt\u0026rsquo;s energy sector. The decision to base the scenarios on upscaling renewables was made in consultation with the Energy Transition Council (ETC). The ETC is a UK Government body formed ahead of COP26. It aims to ensure that clean and sustainable power is the most reliable and affordable option for all (UK Government, 2022). A summary of the scenarios is shown in Table 2, and they are explained in more detail in this subsection.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c/p\u003e\n\u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u003cem\u003eTable 2. Summary of Scenarios.\u003c/em\u003e\u003c/p\u003e\n\u003ctable style=\"width: 4.5e+2pt;border-collapse:collapse;border:none;\"\u003e\n \u003ctbody\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.05pt;border: 1pt solid windowtext;background: rgb(222, 235, 246);padding: 0in 5.4pt;height: 26.5pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cspan style=\"color:black;\"\u003eScenario Code\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 120.5pt;border-color: windowtext windowtext windowtext currentcolor;border-style: solid solid solid none;border-width: 1pt 1pt 1pt medium;border-image: none 100% / 1 / 0 stretch;background: rgb(222, 235, 246);padding: 0in 5.4pt;height: 26.5pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cspan style=\"color:black;\"\u003eScenario Name\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 246.9pt;border-color: windowtext windowtext windowtext currentcolor;border-style: solid solid solid none;border-width: 1pt 1pt 1pt medium;border-image: none 100% / 1 / 0 stretch;background: rgb(222, 235, 246);padding: 0in 5.4pt;height: 26.5pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cspan style=\"color:black;\"\u003eDescription/Purpose\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.05pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 45.95pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eLC\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 120.5pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 45.95pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eLeast Cost\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 246.9pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 45.95pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eRepresents the least cost future for Egypt\u0026rsquo;s energy system with no policy interventions.\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.05pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 31.75pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eFFF\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 120.5pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 31.75pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eFossil Fuel Future\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 246.9pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 31.75pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eQuantifies the emissions generated and the cost of relying on fossil fuels.\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.05pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 45.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eNZ2050\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 120.5pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 45.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eNet Zero by 2050\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 246.9pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 45.7pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eIdentifies the range of technologies needed to decrease CO\u003csub\u003e2\u003c/sub\u003e emissions to net zero by 2050.\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.05pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 45.15pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eISES2035\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 120.5pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 45.15pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eIntegrated Sustainable Energy Strategy 2035\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 246.9pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 45.15pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eModels Egypt\u0026rsquo;s ISES 2035 target of reaching 42% of electricity generation from renewables by 2035.\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.05pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 44.5pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eIRENA2030\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 120.5pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 44.5pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eIRENA\u0026rsquo;s REmap 2030 Analysis\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 246.9pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 44.5pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eModels IRENA\u0026rsquo;s suggestion that the ISES 2035 renewables target should be upgraded to 53% by 2030.\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 85.05pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;height: 38.65pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e60BY2035\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 120.5pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 38.65pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e60% Renewables by 2035\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 246.9pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;height: 38.65pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eModels the scenario where 60% of Egypt\u0026rsquo;s electricity generation comes from renewables by 2035.\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003c/tbody\u003e\n\u003c/table\u003e\n\u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe Least Cost (LC) scenario represents the reference scenario for Egypt\u0026rsquo;s energy sector, where fossil fuel technologies and RETs generate electricity with limited constraints and without policy intervention to minimise cost. Reduced timeslices (see Temporal Structure subsection) were applied and technologies and commodities needed to meet transport demand were removed as including these produced results with a much higher fossil fuel capacity demand than is possible within Egypt. The technology that represents transmission imports in the power sector (PWRTRNIMP) was also removed to investigate how Egypt will meet electricity demand domestically and increase their energy security in the future. In addition, the biomass power plant (PWRBIO001) technology was constrained to 1.4% of 2030 electricity demand based on IRENA\u0026rsquo;s 2018 analysis to reduce its domination of Egypt\u0026rsquo;s electricity generation. These four constraints were applied to all scenarios for consistency. Input data sources for the LC scenario (and therefore the base of all other scenarios) are explained in the Model Data Sources subsection.\u003c/p\u003e\n\u003cp\u003eTo form the Fossil Fuel Future (FFF) scenario, a further constraint was added to the LC scenario by the removal of new capital investment into RETs. For the Net Zero by 2050 (NZ2050) scenario, historical emissions between 2015 and 2019 were averaged to calculate an assumed annual linear increase in CO\u003csub\u003e2\u003c/sub\u003e emissions, which was then extrapolated to peak in 2030. The peak in emissions was set to occur in 2030 as developing economies will not be able to immediately reduce their emissions. This peak value was then linearly decreased to 0 Mt by 2050. Achieving Net Zero by the year 2050 was chosen for Egypt by default due to the lack of an existing target.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe ISES2035 scenario models Egypt ISES target to investigate whether the policy target is ambitious enough to achieve a CET in Egypt in the future. The ISES\u0026rsquo;s 2035 target is broken down into 14% from wind, 22% from solar PV, 3% from CSP and 2% from hydropower technologies (IRENA, 2018b). To complete this scenario, the ISES 2035 target also includes a rapid increase in coal to 16% of Egypt\u0026rsquo;s total electricity generation, and 3.3% of electricity generation from nuclear.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe process of determining the breakdown of the ISES2035 target is shown in Equations 1 and 2.\u003c/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c/p\u003e\n\u003cp\u003e\u003cimg src=\"https://myfiles.space/user_files/58854_b38fc7f3db2c487f/58854_custom_files/img1682357526.png\" width=\"753\" height=\"329\"\u003e\u003cbr\u003e\u003c/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c/p\u003e\n\u003cp\u003eEquation 1 calculates the sum of electricity demand for 2035, which is then multiplied by the ISES defined percentage of a technology for 2035 in Equation 2, e.g. 22% for solar PV. This value was divided by the number of years to linearly increase the proportion of each technology to reach their respective 2035 targets. Additionally, this could be apportioned between multiple types of power plants, e.g. the 14% for wind generation was split into 60% from onshore and 40% from offshore (an assumption based on the space available in the desert and at sea). For hydropower technologies, the generation capacity input data causes the model to generate an accurate amount of electricity, as hydropower capacity is capped in Egypt at 2.8 GW due to the maximum number of dams already built on the River Nile.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThese values were inserted into the model to produce the minimum percentage of electricity generation required from a certain technology by 2035.\u003c/p\u003e\n\u003cp\u003eA report by IRENA states that Egypt\u0026rsquo;s ISES 2035 42% renewable target should be increased to 53% of Egypt\u0026rsquo;s electricity generation to be supplied from RETs by 2030 (IRENA, 2018b). IRENA\u0026rsquo;s target is split into 4.0% hydropower, 18.4% wind, 1.4% biofuels, 21.3% solar PV and 8.3% from CSP (IRENA, 2018b). The methodology is similar to the ISES2035 scenario; however, the total electricity demand used to calculate the percentages for each technology is based on the lesser 2030 demand value rather than the 2035 value.\u003c/p\u003e\n\u003cp\u003eTo model a more ambitious target, the 60% by 2035 (60BY2035) scenario was created to represent a still higher proportion of electricity generation from RETs. The custom percentages of each technology are broken down as follows: 20% wind, 2% biofuels, 24% solar PV and 9% CSP (and 5% hydropower). The methodology is similar to both the ISES2035 and IRENA2030.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eA more detailed description of the analysis can be found online Zenodo (Gibson, 2023).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe constraints for the six scenarios are summarised in Table 3.\u003c/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c/p\u003e\n\u003cdiv style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;' align=\"center\"\u003e\n \u003ctable style=\"width: 7.4e+2pt;border-collapse:collapse;border:none;\"\u003e\n \u003ctbody\u003e\n \u003ctr\u003e\n \u003ctd rowspan=\"2\" style=\"width: 70.8pt;border: 1pt solid windowtext;background: rgb(222, 235, 246);padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cspan style=\"color:black;\"\u003eScenario Code\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd rowspan=\"2\" style=\"width: 70.9pt;border-color: windowtext windowtext windowtext currentcolor;border-style: solid solid solid none;border-width: 1pt 1pt 1pt medium;border-image: none 100% / 1 / 0 stretch;background: rgb(222, 235, 246);padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cspan style=\"color:black;\"\u003eScenario Name\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd colspan=\"7\" style=\"width: 602.25pt;border-color: windowtext windowtext windowtext currentcolor;border-style: solid solid solid none;border-width: 1pt 1pt 1pt medium;border-image: none 100% / 1 / 0 stretch;background: rgb(189, 215, 238);padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:center;'\u003e\u003cspan style=\"color:black;\"\u003eOSeMOSYS Constraints\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 63.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;background: rgb(222, 235, 246);padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cspan style=\"color:black;\"\u003eReduced Time Slices (96\u003c/span\u003e\u003cspan style=\"font-family:Wingdings;color:black;\"\u003e\u0026agrave;\u003c/span\u003e\u003cspan style=\"color:black;\"\u003e8)\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 71.05pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;background: rgb(222, 235, 246);padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cspan style=\"color:black;\"\u003eTransport Technologies Removed\u0026nbsp;\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;background: rgb(222, 235, 246);padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cspan style=\"color:black;\"\u003ePWRTRNIMP Removed\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 85.2pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;background: rgb(222, 235, 246);padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cspan style=\"color:black;\"\u003ePWRBIO001 (Biomass) Constrained to\u0026nbsp;\u003c/span\u003e\u003cspan style=\"color:black;\"\u003e% of 2030 demand\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 113.35pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;background: rgb(222, 235, 246);padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cspan style=\"color:black;\"\u003eNew Investment into RETs Removed\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 92.1pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;background: rgb(222, 235, 246);padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cspan style=\"color:black;\"\u003eAnnual Emissions Limited\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 106.25pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;background: rgb(222, 235, 246);padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cspan style=\"color:black;\"\u003eProduction Limited per Technology\u003c/span\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 70.8pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eLC\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.9pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eLeast Cost\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 63.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 71.05pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 85.2pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style=\"color:#202124;\"\u003e1.4\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 113.35pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 92.1pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 106.25pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 70.8pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eFFF\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.9pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eFossil Fuel Future\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 63.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 71.05pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 85.2pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style=\"color:#202124;\"\u003e1.4\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 113.35pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u0026nbsp;\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e(Geothermal, Solar PV, CSP, Hydro and Wind)\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 92.1pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 106.25pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 70.8pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eNZ2050\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.9pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eNet Zero by 2050\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 63.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 71.05pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 85.2pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style=\"color:#202124;\"\u003e1.4\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 113.35pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 92.1pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 106.25pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 70.8pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eISES2035\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.9pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eRenewable Integrated Sustainable Energy Strategy 2035\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 63.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 71.05pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 85.2pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style=\"color:#202124;\"\u003e1.4\u003c/span\u003e\u003c/strong\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e\u0026nbsp;\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 113.35pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 92.1pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Quattrocento Sans\",sans-serif;color:#202124;'\u003e\u0026nbsp;\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 106.25pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e(Solar PV, CSP, Wind, Biomass, Hydro, Coal, Nuclear)\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 70.8pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eIRENA2030\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.9pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003eIRENA\u0026rsquo;s REmap scenario\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 63.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 71.05pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 85.2pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e1.4\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 113.35pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 92.1pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Quattrocento Sans\",sans-serif;color:#202124;'\u003e\u0026nbsp;\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 106.25pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e(Solar PV, CSP, Wind, Biomass, Hydro)\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003ctr\u003e\n \u003ctd style=\"width: 70.8pt;border-color: currentcolor windowtext windowtext;border-style: none solid solid;border-width: medium 1pt 1pt;border-image: none 100% / 1 / 0 stretch;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e60BY2035\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.9pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e60% Renewables by 2035\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 63.6pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Quattrocento Sans\",sans-serif;color:#202124;'\u003e\u0026nbsp;\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 71.05pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Quattrocento Sans\",sans-serif;color:#202124;'\u003e\u0026nbsp;\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 70.7pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Segoe UI Symbol\",sans-serif;color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style=\"color:#202124;\"\u003e\u0026nbsp;\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 85.2pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style=\"color:#202124;\"\u003e2.0\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 113.35pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u0026nbsp;\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 92.1pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Quattrocento Sans\",sans-serif;color:#202124;'\u003e\u0026nbsp;\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003c/td\u003e\n \u003ctd style=\"width: 106.25pt;border-color: currentcolor windowtext windowtext currentcolor;border-style: none solid solid none;border-width: medium 1pt 1pt medium;padding: 0in 5.4pt;vertical-align: top;\"\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e\u003cstrong\u003e\u003cspan style='font-family:\"Arial Unicode MS\";color:#202124;'\u003e✓\u003c/span\u003e\u003c/strong\u003e\u003c/p\u003e\n \u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;'\u003e(Solar PV, CSP, Wind, Biomass, Hydro)\u003c/p\u003e\n \u003c/td\u003e\n \u003c/tr\u003e\n \u003c/tbody\u003e\n \u003c/table\u003e\n\u003c/div\u003e\n\u003cp style='margin-top:0in;margin-right:0in;margin-bottom:8.0pt;margin-left:0in;line-height:107%;font-size:15px;font-family:\"Calibri\",sans-serif;text-align:justify;'\u003e\u003cem\u003eTable 3. The six scenarios created using OSeMOSYS, with their respective constraints\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003e\u003cem\u003e\u003cspan style='font-size:15px;line-height:107%;font-family:\"Calibri\",sans-serif;'\u003e\u003cbr\u003e\u0026nbsp;\u003c/span\u003e\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003e\u003cem\u003eTemporal Structure\u0026nbsp;\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eWithin OSeMOSYS, the energy load curve is represented by timeslices, which are defined as the time split of each modelled year. These timeslices allow the separation of periods of high or low demand, and they can be grouped into seasons or night and day. For this study each model year was represented by four seasons, each with two 12-hour components representing night and day.\u003c/p\u003e\n\u003cp\u003e\u003cem\u003eReference Energy System\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eThe interactions and flow of energy between the technologies and fuels are systematically represented in the form of a Reference Energy System (RES). The RES illustrates the structure of Egypt\u0026rsquo;s energy sector (Figure 2) with the four tiers from left to right consisting of primary fuel supply, power generation technologies, transmission and distribution infrastructures and the final demand sectors (Rady \u003cem\u003eet al\u003c/em\u003e., 2018).\u003c/p\u003e\n\u003cp\u003e\u003cem\u003eModel Data Sources\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eIf specific input data could not be sourced at the national level, parameters, such as the capacity factors for power plants, were assumed to be similar to other Northern African countries and sourced from international organisations such as the International Energy Agency (IEA) and IRENA. The current energy system data, fuel costs, and transmission and distribution data were sourced from Climate Compatible Growth\u0026rsquo;s (CCG) Starter Data Kit (SDK) (Allington \u003cem\u003eet al\u003c/em\u003e., 2021). CCG is a UK Aid funded research programme that assists developing countries in achieving low carbon development (CCG, 2022). Included in the SDK were the estimated installed capacities for the power generation technologies, sourced from Brinkerink \u0026amp; Deane (2020), Brinkerink \u003cem\u003eet al\u003c/em\u003e. (2021), Byers \u003cem\u003eet al\u003c/em\u003e. (2018) and IRENA (2020a) for the 2018 values. Values for Egypt\u0026rsquo;s electricity transmission and distribution were sourced from Pappis \u003cem\u003eet al\u003c/em\u003e., 2019. Fuel price projections to 2050 were sourced from the Energy Information Administration\u0026nbsp;(EIA,\u0026nbsp;2020) and IRENA 2018a. Egypt\u0026rsquo;s full country dataset, including capital fixed costs for power plants, were sourced from the SDK and is openly accessible on Zenodo (Allington \u003cem\u003eet al.,\u003c/em\u003e 2023). Renewable constraints in the scenarios were based on policies from the New and Renewable Energy Authority (NREA) (2020) and IRENA (2018a).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u003cem\u003eLimitations\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eIt should be borne in mind that a model represents a simplification of reality, and cannot entirely include all considerations that impact an energy system. A significant limitation of OSeMOSYS is that variations in the climate system due to global warming are not represented in the constraints or input data. For example, an increase in temperature will negatively impact the efficiency of conventional power plants. There will also be a change to rainfall rates and distribution, impacting the electricity generation from hydropower plants (UNFCCC, 2017). In principle, OSeMOSYS can be combined with the Climate, Land, Energy and Water systems (CLEWs) model to overcome this limitation.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThis study was limited to Egypt\u0026rsquo;s energy sector without transport demand or electricity transmission imports. The scenario outputs have been restricted in two additional ways: 1) for the ISES2035, IRENA2030 and 60BY2035 scenarios, all solar technologies and wind technologies with storage (PWRSOL002, PWRSOL001S, PWRWND001S and PWRCSP002) have been removed as the targets outlined in ISES and IRENA\u0026rsquo;s 2018 report do not include storage technologies; and 2) energy efficiency technologies that use less fuel resources but produce the same amount of electricity have not been included due to inaccurate cost projections associated with the model\u0026rsquo;s output files.\u003c/p\u003e"},{"header":"Results And Discussion","content":"\u003cp\u003e\u003cem\u003eElectricity Production\u0026nbsp;\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eA summary of the electricity production for the six scenarios, measured in PJ, required from each technology each year is depicted in Figure 3.\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eIn the LC scenario, interrogation of the raw data underlying the graph revealed that 26.8% of electricity production would be sourced from natural gas (CCGT and SCGT) technologies over the entire modelling period. The three wind technologies (onshore, offshore and onshore with storage) dominate the LC pathway with a contribution of 46.5%. In the FFF scenario, the electricity production is dominated by natural gas technologies and coal, with coal power plants generating 42.6% of required electricity over the modelling period. The Net Zero by 2050 scenario is dominated by wind and solar technologies with 61.3% and 36.5% respectively of electricity generated by these sources in the year 2070.\u003c/p\u003e\n\u003cp\u003eThe technologies required to meet Egypt\u0026rsquo;s current target of 42% electricity generation to be sourced from RETs by 2035 are also depicted in Figure 3. Over the modelling period, coal power plants generate 9.4% of Egypt\u0026rsquo;s electricity, considerably less than in the FFF scenario.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eFor the IRENA2030 scenario over the entire modelling period, 17.5% and 3.1% of electricity generation is from solar PV plants and CSP plants respectively. Onshore wind projects produced 17.0% of electricity production across all modelled years, and offshore wind represented 10.4%.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe 60BY2035 scenario, despite relying on higher levels of RETs until 2035, shows a larger proportion of coal production (9.1%) than the IRENA2030 scenario (5.0%) over the entire modelling period. Overall, fossil fuel technologies still produce 52.5% of Egypt\u0026rsquo;s electricity across all modelled years.\u003c/p\u003e\n\u003cp\u003e\u003cem\u003eInstalled Capacity\u0026nbsp;\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eFigure 4 shows the total annual capacity in GW for the six scenarios. Overall, the amount of installed annual capacity in the FFF scenario is much lower in comparison to the LC scenario, with the system peaking at just 148 GW in the year 2070. The NZ2050 installed capacity is higher than in both FFF and LC scenarios due to the severe reduction in fossil fuel technologies, and it is dominated by the three wind technologies. For the ISES2035 scenario, solar\u003cstrong\u003e\u0026nbsp;\u003c/strong\u003ePV represents 2,482.8 GW of the scenario\u0026rsquo;s installed capacity over the model period. This is followed by onshore wind with an installed capacity of 1,945.2 GW over the model period. The installed capacity for the 60BY2035 scenario is smaller than the ISES2035 and IRENA2030 scenarios due to the larger amount of capacity from natural gas and coal technologies.\u003c/p\u003e\n\u003cp\u003e\u003cem\u003eFurther Findings from the FFF, LC and NZ2050 Scenario Data\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eThe FFF scenario defines the technologies that would dominate a future without capital investment into RETs. The total cost of this scenario is $2.17 trillion, which is more expensive than the renewable scenarios (ISES2035, IRENA2030 and 60BY2035) due to the high operation and maintenance (O\u0026amp;M) costs of input fossil fuels (Figure 5).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe NZ2050 scenario defines the technologies that are required to decrease CO\u003csub\u003e2\u003c/sub\u003e emissions to zero by 2050 and includes the phase out of natural gas. Despite the scenario\u0026rsquo;s apparently less expensive total system cost (Figure 5), in reality it would be much more expensive due to the need for energy efficient technologies, the cost of which is not included in these results. From the NZ2050 and LC scenarios, it can be deduced that solar PV and onshore wind need to dominate Egypt\u0026rsquo;s future renewables landscape and are needed to phase out natural gas (see LC and NZ2050 charts in Figure 3).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u003cem\u003eFurther Findings from the ISES2035 Scenario Data\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eThe ISES2035 scenario models the government\u0026rsquo;s target of 42% of electricity generation to be sourced from RETs by 2035. The data behind Figure 5 revealed that this will cost $121.1 billion by 2035, and will save 7308.8 Mt of CO\u003csub\u003e2\u003c/sub\u003e emissions by 2070 compared to the FFF scenario (Appendix 1). In this scenario, solar PV will need to produce the largest amount of electricity compared to other RETs.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe Egyptian government\u0026rsquo;s decision to include coal production (16%) within the ISES2035 target was based on the need to import coal to supply Egypt\u0026rsquo;s cement plants after the political instability of 2011 (Zayed \u0026amp; Sowers, 2014). The current government, under President El-Sisi, continues to embrace coal imports for use in industrial production, although the COP26 mandate of \u0026lsquo;unabated coal power phasedown\u0026rsquo; may encourage the Egyptian government to revise this target. If the Egyptian government agreed to prevent coal production in the future in line with United Nations Framework Convention on Climate Change (UNFCCC) requirements, this could create certainty for private investment into renewable alternatives (Burki, 2022) and provide environmental and health benefits (Zayed \u0026amp; Sowers, 2014).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u003cem\u003eFurther Findings from the IRENA2030 and 60BY2035 Scenario Data\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eAn important component of ensuring a clean energy transition is increasing the proportion of electricity generation from RETs. This process is represented in the IRENA2030 and 60BY2035 scenarios. The CO\u003csub\u003e2\u003c/sub\u003e emissions trajectory until 2035 for the six scenarios can be found in Figure 6. Data behind Figures 5 and 6 reveals that the total system costs of the IRENA2030 scenario between 2015 and 2030 is $16.4 billion more expensive than the equivalent period for the ISES2035 scenario, but saves 110.0 Mt of CO\u003csub\u003e2\u003c/sub\u003e from being emitted over the same time period.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eAlthough there is a large proportion of electricity production from RETs, the results of the IRENA2030 scenario highlights the importance of continuing to extend renewable energy targets into the second half of the 21\u003csup\u003est\u003c/sup\u003e century. Until 2030, natural gas production (CCGT \u0026amp; SCGT) was decreasing to meet the 53% target; however, it increases between 2030 and 2059, and is then replaced by coal production (Figure 3).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe 60BY2035 scenario represented an increase in IRENA\u0026rsquo;s analysis from 53% to 60% of electricity generation originating from RETs. By 2035, the 60BY2035 scenario will prevent 211.5 Mt of CO\u003csub\u003e2\u003c/sub\u003e emissions compared to the ISES2035 scenario. Overall, the 60BY2035 scenario will cost $55.3 billion more than ISES2035 (Figure 5). Despite the CO\u003csub\u003e2\u0026nbsp;\u003c/sub\u003eemissions reduction by 2035, between 2015 and 2070 the 60BY2035 scenario produces 180.5 Mt more than ISES2035 and 912.6 Mt more than IRENA2030 (Appendix 1). This is due to significant coal production towards the end of the modelling period.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eA large component of achieving a CET is reaching net zero CO\u003csub\u003e2\u003c/sub\u003e emissions by a certain year. When reviewing all three renewable scenarios, ISES2035, IRENA2030, 60BY2035, Egypt\u0026rsquo;s energy system CO\u003csub\u003e2\u0026nbsp;\u003c/sub\u003eemissions at 2050 are 107.3 Mt, 89.8 Mt and 104.2 Mt respectively, compared to the NZ2050 scenario reaching 0 Mt by 2050 (Appendix 2).\u003c/p\u003e\n\u003cp\u003eAlthough the upscaling efforts of RETs for electricity production is apparent, the presence of natural gas prevents the CO\u003csub\u003e2\u003c/sub\u003e emissions from decreasing more significantly. This highlights the importance of phasing out fossil fuel technologies alongside upscaling RETs to successfully achieve a CET.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u003cem\u003eUpscaling Renewable Energy Technologies: Private Investment and Bilateral Investment Treaties\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eGiven Egypt\u0026rsquo;s rapid population growth and subsequent increase in energy demand, private sector investment into new renewable energy projects is critical, along with transforming existing power sector structures and processes (Davies \u003cem\u003eet al\u003c/em\u003e., 2016; Fadly 2019). The upfront cost of upscaling RETs will rely on private investment as public funding is unlikely to supply more than 15% of the investment needed (IRENA, 2016). The capital upfront costs for the ISES2035 and IRENA2030 scenarios are $791.7 billion and $806.7 billion, respectively (Figure 5), and these will rely on financing mechanisms within the private sector.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eIn addition to private sector investment, RET upscaling could be supported by increasing the number of bilateral investment treaties to guarantee free transfer of investments (Davies \u003cem\u003eet al.\u003c/em\u003e, 2016). This depends on reliable governance, which is a fundamental necessity to secure both the bilateral and multilateral funding needed to develop large infrastructure projects (Hafner \u003cem\u003eet al.\u003c/em\u003e, 2018). The large-scale deployment of renewable energy capacity in Egypt would ensure that more natural gas is available for export (which is more profitable compared to domestic use), enabling domestic demand to be met by a larger percentage of RETs (Davies \u003cem\u003eet al\u003c/em\u003e., 2016).\u003c/p\u003e\n\u003cp\u003e\u003cem\u003eBarriers to a Clean Energy Transition in Egypt\u0026nbsp;\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eThree major barriers may prevent Egypt from achieving a CET: 1) the recent discovery of natural gas reserves in the Mediterranean, 2) political instability that acts to decrease investor confidence, and 3) the need for sufficient climate finance from developed countries.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eAccording to the results of this research, natural gas is and will be a reliable source of electricity generation for Egypt. This is unlikely to change in the future due to the commissioning of the Zohr gas field in 2017, which was followed by the larger discovery of the Noor area close to the Cypriot gas fields (El Shayeb, 2020). These discoveries have helped Egypt to fill the growing domestic supply gap due to a decline in other Mediterranean fields and growing demand (Lottaroli \u0026amp; Meciani, 2022). Based on Egypt\u0026rsquo;s recent history of energy supply shortages, these discoveries represent future energy security and economic prosperity, and it is therefore likely Egypt will take advantage of this domestic fossil fuel production.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe second barrier to achieving a CET in Egypt is political instability that impacts investor confidence. Political instability refers to both social-political unrest, such as the 2011 revolution, but also the potential for government regimes to collapse (Abdelkader, 2017). There is a strong correlation between political instability and negative economic growth, as the uncertainty associated with instability harms macroeconomic variables such as private investment (Mayer \u0026amp; Zhao, 2021). President El-Sisi has brought relative stability to Egypt, but recent developments such as armed clashes in the Sinai Peninsula and border tensions with Libya and Sudan may derail this stability in the future (Mayer \u0026amp; Zhao, 2021). \u0026nbsp;\u003c/p\u003e\n\u003cp\u003eThe final barrier preventing Egypt from achieving a CET is a lack of sufficient climate finance from developed countries under the Paris Agreement, which is emphasised within Egypt\u0026rsquo;s NDC. In 2019, developed countries mobilised only $79.6 billion of the promised $100 billion per year, with the USA, Australia and Canada not contributing their full share (Bos \u003cem\u003eet al.\u003c/em\u003e, 2021). The funding is broken down into four funds, with the Green Climate Fund (GCF) financing two projects in Egypt: the adaptation programme and the GCF-EBRD Egypt Renewable Energy Financing Framework with total project values of $105.2 million and $1 billion, respectively (GCF, 2022). The former aims to protect the vulnerable communities and coastline in the Nile delta, which is among the top three most vulnerable regions in the world to the impacts of climate change (GCF, 2022). The latter aims to scale up investments to support the development and construction of renewable energy projects, and will generate around 1,400 GWh electricity annually and avoid 800,000 tCO\u003csub\u003e2\u003c/sub\u003ee annually (GCF, 2022). For more such projects to occur in Egypt, the UNFCCC climate financing process needs to reach its maximum annual capacity.\u003c/p\u003e\n\u003cp\u003e\u003cem\u003ePolicy Recommendations\u0026nbsp;\u003c/em\u003e\u003c/p\u003e\n\u003cp\u003eThe following policy recommendations are based on the scenario results and related discussion.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eShort-term\u0026nbsp;\u003c/p\u003e\n\u003col type=\"1\" start=\"1\"\u003e\n \u003cli\u003eIntegrate RETs, particularly onshore wind and solar PV, into the energy system via technical, financial and regulatory recommendations.\u0026nbsp;\u003c/li\u003e\n \u003cli\u003eTo reduce CO\u003csub\u003e2\u003c/sub\u003e emissions sooner, update Egypt\u0026rsquo;s national renewable energy target from 42% by 2035 to 53% by 2030, as recommended by IRENA.\u003c/li\u003e\n \u003cli\u003eTo eliminate coal as a future option for Egypt, adopt the COP26 mandate of phasing out coal by introducing an energy sector ban.\u003c/li\u003e\n\u003c/ol\u003e\n\u003cp\u003eLong-term\u003c/p\u003e\n\u003col type=\"1\" start=\"1\"\u003e\n \u003cli\u003eBased on environmental and financial analysis, extend national renewable energy targets into the second half of the 21\u003csup\u003est\u003c/sup\u003e century to prevent an increase in fossil fuel production.\u003c/li\u003e\n \u003cli\u003eAs the quantity of renewable projects increases, expand the grid as required through international bilateral projects, or financial assistance from the government.\u003c/li\u003e\n \u003cli\u003eAlongside the extension of renewable targets, identify financial and regulatory mechanisms to phase out natural gas production.\u003c/li\u003e\n\u003c/ol\u003e"},{"header":"Conclusion","content":"\u003cp\u003eThis research investigated the impact on Egypt\u0026rsquo;s energy sector of upscaling renewable energy technologies to determine whether a clean energy transition will be possible in the future. Overall, the upfront cost of upscaling RETs in Egypt will be high, but the CO\u003csub\u003e2\u003c/sub\u003e emission reduction is needed to contribute to the prevention of global temperatures increasing above 2\u003csup\u003eo\u003c/sup\u003eC, and it will be less costly than locking the country into a high-carbon pathway. The results showed that solar PV and onshore wind are key technologies to be upscaled to contribute towards Egypt\u0026rsquo;s CET. Furthermore, the results indicate that IRENA\u0026rsquo;s suggestion to expand Egypt\u0026rsquo;s current ISES 2035 renewables target from 42% to 53% by 2030 will cost $16.4 billion more between 2015 and 2030, saving 110.0 Mt over the same period. The overall capital investment into RETs (PV, CSP, onshore and offshore wind and hydro) for the IRENA2030 scenario is $23.6 billion more than for ISES2035. The 60% RETs by 2035 scenario would cost $56.0 billion more than IRENA\u0026rsquo;s 2030 analysis and emit more CO\u003csub\u003e2\u003c/sub\u003e over the entire modelling period due to the presence of coal production. Therefore, it can be concluded that IRENA\u0026rsquo;s 2030 target of 53% is the optimal renewable generation target for Egypt, based on the scenarios modelled. The success of a CET in Egypt is dependent on reducing domestic natural gas production and preventing coal production in the future. This transition will be difficult due to recent natural gas discoveries in the Mediterranean, and the challenge of achieving energy security in a rapidly changing country. \u003c/p\u003e"},{"header":"Declarations","content":"\u003cp\u003e\u003cstrong\u003eAcknowledgements \u0026nbsp;\u003c/strong\u003e\u003c/p\u003e\n\u003cp\u003eThis paper was originally submitted as a Master\u0026rsquo;s thesis to Imperial College London and is based entirely on the author\u0026rsquo;s individual findings. The subject area of upscaling renewables within the context of Egypt was influenced by the Energy Transition Council (ETC) within the UK Government\u0026rsquo;s Business, Energy and Industrial Strategy (BEIS) department, now the Department for Energy Security and Net Zero. This material has been supported by the Climate Compatible Growth (CCG) programme, which brings together leading research organisations and is led out of the STEER centre, Loughborough University. CCG is funded by the FCDO in the UK Government. However, the views expressed herein do not necessarily reflect the UK Government\u0026apos;s official policies.\u0026nbsp;This paper was reviewed and edited by Simon Patterson (CCG, Loughborough University).\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u003cstrong\u003eU4RIA Compliance Statement\u003c/strong\u003e\u003c/p\u003e\n\u003cp\u003eThis work follows the U4RIA guidelines which provide a set of high-level goals relating to conducting energy system analyses in countries. This paper was carried out involving stakeholders in the development of models, assumptions, scenarios and results (Ubuntu / Community). The authors ensure that all data, source code and results can be easily found, accessed, downloaded and viewed (retrievability), licensed for reuse (reusability), and that the modelling process can be repeated in an automatic way (repeatability). The authors provide complete metadata for reconstructing the modelling process (reconstructability), ensuring the transfer of data, assumptions and results to other projects, analyses and models (interoperability), and facilitating peer-review through transparency (auditability).\u003c/p\u003e\n\u003cp\u003e\u003cstrong\u003eCRediT Statement\u003c/strong\u003e\u003c/p\u003e\n\u003cp\u003eZen Makuch: Supervision, Writing \u0026amp; Review. Rudolf Yeganyan: Methodology. Carla Cannone: Software, Validation. Naomi Tan: Software, Validation. Mark Howells: Supervision.\u003c/p\u003e\n\u003cp\u003e\u003cstrong\u003eDeclaration of competing interest:\u003c/strong\u003e\u003c/p\u003e\n\u003cp\u003eThe authors declare that they have no known competing financial interests or personal relationships that could have influenced the work reported in this paper.\u003c/p\u003e"},{"header":"References","content":"\u003cp\u003eAbdelkader, H. (2017) Political Instability and Economic Growth in Egypt. \u003cem\u003eReview of Middle East Economics and Finance\u003c/em\u003e, 3(2), 1-12.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eAllington, L., Cannone, C., Pappis, I., Cervantes, K., Usher, W., Pye, S., Howells, M., Taliotis, C., Sundin, C., Sridharah, V., Ramos, E., Brinkerink, M., Deane, P. et al. (2021) Selected \u0026lsquo;Starter Kit\u0026rsquo; energy system modelling data for Egypt (#CCG)\u003cem\u003e.\u0026nbsp;\u003c/em\u003eAvailable at: https://www.researchsquare.com/article/rs-479263/v2 [Accessed 10th June 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eAllington, L., Cannone, C., Pappis, I., Cervantes, K., Usher, W., Pye, S., Howells, M., Taliotis, C., Sundin, C., Sridharah, V., Ramos, E., Brinkerink, M., Deane, P. et al. (2023) \u003cem\u003eCCG Starter Data Kit: Egypt\u003c/em\u003e. Zenodo Repository. Available at: https://zenodo.org/record/7526341#.ZBcIu3bP1Pb [Accessed 15th February 2023].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eArab Development Portal (2016) Egypt\u0026rsquo;s Vision 2030. Available at: https://arabdevelopmentportal.com/sites/default/files/publication/sds_egypt_vision_2030.pdf [Accessed 19th June 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eBos, J., Gonzalez, L. \u0026amp; Thwaites, J. (2021) \u003cem\u003eAre Countries Providing enough to the $100 billion climate finance goal?\u0026nbsp;\u003c/em\u003eWorld Resources Institute. Available at: https://www.wri.org/insights/developed-countries-contributions-climate-finance-goal [Accessed 18th August 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eBrinkerink, M. \u0026amp; Deane, P. (2020) \u003cem\u003ePLEXOS-World 2015\u003c/em\u003e. Available at: https://dataverse.harvard.edu/dataset.xhtml?persistentId=doi:10.7910/DVN/CBYXBY [Accessed 12th June 2022].\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eBrinkerink, M., Gallach\u0026oacute;ir, B. \u0026amp; Deane, P. (2021) Building and Calibrating a Country-Level Detailed Global Electricity Model Based on Public Data. \u003cem\u003eEnergy Strategy Reviews\u003c/em\u003e, 33, 1-12\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eBurki, T. (2022) \u0026ldquo;Phasedown\u0026rdquo; of coal use after COP26 negotiations. \u003cem\u003eThe Lancet Respiratory Medicine\u003c/em\u003e, 10(1), 10-11.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eByers, L., Friedrich, J., Hennig, A., Kressig, L., McCormick, C. \u0026amp; Malaguzzi, L. (2018) \u003cem\u003eA Global Database of Power Plants\u003c/em\u003e. World Resources Institute. Available at: https://www.wri.org/publication/global-power-plant-database [Accessed 17th June 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eClimate Compatible Growth (CCG) (2022). \u003cem\u003eAbout us\u003c/em\u003e. Available at: https://climatecompatiblegrowth.com/about-us/ [Accessed 16th June 2022].\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eDavies, M., Hodge, B., Ahmad, S. \u0026amp; Wang, Y. (2016) \u003cem\u003eDeveloping renewable energy projects: A guide to achieving success in the Middle East\u003c/em\u003e. PwC and Eversheds. Available at: https://www.pwc.com/m1/en/publications/documents/eversheds-pwc-developing-renewable-energy-projects.pdf [Accessed 19th August 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eDaily News Egypt (2022) \u003cem\u003eEgypt has $26bn development portfolio under 2030 Vision: Al-Mashat\u003c/em\u003e. Available at: https://dailynewsegypt.com/2022/04/23/egypt-has-26bn-development-portfolio-under-2030-vision-al-mashat/ [Accessed 19\u003csup\u003eth\u003c/sup\u003e July 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eEgyptian Environmental Affairs Agency (EEAA) (2021) \u003cem\u003eSummary for Policymakers: Egypt National Climate Change Strategy (NCCS) 2050\u003c/em\u003e. Available at: https://www.eeaa.gov.eg/portals/0/eeaaReports/N-CC/EgyptNSCC-2050-Summary-En.pdf [Accessed 30th July 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eEgyptToday (2021) \u003cem\u003eOverview of Egypt\u0026rsquo;s green projects within Vision 2030\u003c/em\u003e. Available at: https://www.egypttoday.com/Article/3/99857/Overview-of-Egypt-s-green-projects-within-Vision-2030 [Accessed 14th July 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eEnergy Information Administration (EIA) (2020) \u003cem\u003eAnnual Energy Outlook 2020 with projections to 2050\u003c/em\u003e. Energy Information Administration. Available at: https://www.eia.gov/outlooks/aeo/pdf/AEO2020%20Full%20Report.pdf [Accessed 18\u003csup\u003eth\u003c/sup\u003e June 2022]. \u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eEl Shayeb, H., Abdel-Gawad, G., Noah, A., Abuelhasan, M. \u0026amp; Ataallah, M. (2020) Comparative study between density porosity and density magnetic resonance porosity: a case study of Sequoia gas reservoir, Mediterranean offshore gas, Egypt. \u003cem\u003eArabian Journal of Geosciences\u003c/em\u003e, 13 (8), 1-8.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eEuropean Union (EU) (2015) \u003cem\u003e\u0026lsquo;Integrated Sustainable Energy Strategy\u0026rsquo; for Technical Assistance to Support the Reform of the Energy Sector (TARES)\u003c/em\u003e, European Delegation of the European Union to Egypt. Available at: https://eeas.europa.eu/archives/delegations/egypt/press_corner/all_news/news/2016/20160718_en.pdf [Accessed 18th June 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eFadly, D. (2019) Low-carbon transition: Private sector investment in renewable energy projects in developing countries. \u003cem\u003eWorld Development\u003c/em\u003e, 122, 552-569.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eGardumi, F., Shivakumar, A., Morrison, R., Taliotis, C., Broad, O., Beltramo, A., Sridharan, V., Howells, M., H\u0026ouml;rsch, J., Niet, T., Almulla, Y., Ramos, E., Burandt, T. et al. (2018) From the development of an open-source energy modelling tool to its application and the creation of communities of practice: The example of OSeMOSYS. \u003cem\u003eEnergy Strategy Reviews\u003c/em\u003e, 20, 209-228.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eGardumi, F., Welsch, M., Howells, M. \u0026amp; Emanuela, C. (2019) Representation of Balancing Options for Variable Renewables in Long-Term Energy System Models: An Application to OSeMOSYS. \u003cem\u003eEnergies\u003c/em\u003e, 12 (12), 2366-2388. \u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eGibson, A. (2023)\u0026nbsp;\u003cem\u003eCCG Egypt Scenarios\u003c/em\u003e. Zenodo Repository. Available at: https://doi.org/10.5281/zenodo.7743874 [Accessed 17th March 2023].\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eGreen Climate Fund (GCF) (2022) \u003cem\u003eGCF-EBRD Egypt Renewable Energy Financing Framework\u003c/em\u003e. Available at: https://www.greenclimate.fund/project/fp039 [Accessed 19th August 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eHafner, M., Tagliapietra, S. \u0026amp; de Strasser, L. (2018) Prospects for Renewable Energy in Africa. In\u003cem\u003e: Energy in Africa Challenges and Opportunities\u003c/em\u003e. Switzerland, Springer International Publishing, 47-73.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eHowells, M., Rogner, H., Roehrl, A., Strachan, N., Heaps, C., Huntington, H., Kypreos, S., Hughes, A., Silveira, S., Decarolis, J. \u0026amp; Bazillian, M. (2011) OSeMOSYS: The Open Source Energy Modelling System An introduction to its ethos, structure and development. \u003cem\u003eEnergy Policy\u003c/em\u003e, 39(10), 5850-5870.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eIEA (2022) \u003cem\u003eEgypt\u003c/em\u003e. International Energy Agency. Available at: https://www.iea.org/countries/egypt [Accessed 14th May 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eInternational Renewable Energy Agency (IRENA) (2016) \u003cem\u003eUnlocking Renewable Energy Investment: The Role of Risk Mitigation and Structured Finance\u003c/em\u003e. International Renewable Energy Agency. Available at: https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2016/IRENA_Risk_Mitigation_and_Structured_Finance_2016.pdf [Accessed 19th August 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eIRENA (2018a) \u003cem\u003ePlanning and Prospects for Renewable Power: West Africa\u003c/em\u003e. Available at: https://www.irena.org/publications/2018/Nov/Planning-and-prospects-for-renewable-power [Accessed 10th July 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eIRENA (2018b) \u003cem\u003eRenewable Energy Outlook Egypt\u003c/em\u003e. International Renewable Energy Agency. Available at: https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2018/Oct/IRENA_Outlook_Egypt_2018_En.pdf [Accessed 20th June 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eIRENA (2020a) \u003cem\u003eRenewable Energy Statistics 2020\u003c/em\u003e. The International Renewable Energy Agency. Available at: https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2020/Jul/IRENA_Renewable_Energy_Statistics_2020.pdf [Accessed 18th June 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eL\u0026ouml;ffler, K., Hainsch, K., Burandt, T., Oei, P., Kemfert, C. \u0026amp; von Hirschhausen, C. (2017) Designing a Model for the Global Energy System \u0026ndash; GENeSYS-MOD: An Application of the Open-Source Energy Modelling System (OSeMOSYS). \u003cem\u003eEnergies\u003c/em\u003e, 10, 1-28.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eLottaroli, F. \u0026amp; Meciani, L. (2022) The rejuvenation of hydrocarbon exploration in the Eastern Mediterranean. \u003cem\u003ePetroleum Geoscience\u003c/em\u003e, 28(1), 1-17.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eMayer, M. \u0026amp; Zhao, Y. (2021) Do Political Instability and Military Expenditure Undermine Economic Growth in Egypt? Evidence from the ARDL Approach. \u003cem\u003eDefence and Peace Economics\u003c/em\u003e, 1-24.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eMoksnes, N., Welsch, M., Gardumi, F., Shivakumar, A., Broad, O., Howells, M., Taliotis, C. \u0026amp; Sridharan, V. (2015) \u003cem\u003e2015 OSeMOSYS User Manual\u003c/em\u003e. KTH Royal Institute of Technology. Available at: http://www.osemosys.org/uploads/1/8/5/0/18504136/new-website_osemosys_manual_-_working_with_text_files_-_2015-11-05.pdf [Accessed 14th May 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eMondal, M., Ringler, C., Al-Riffai, P., Eldidi, H., Breisinger, C. \u0026amp; Wiebelt, M. (2018) Long-term optimisation of Egypt\u0026rsquo;s power sector: Policy implications. \u003cem\u003eEnergy\u003c/em\u003e, 166, 1063-1073.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eNew and Renewable Energy Authority (NREA) (2020) \u003cem\u003eAnnual Report \u0026ndash; 2020\u003c/em\u003e. New and Renewable Energy Authority. Available at: http://nrea.gov.eg/Content/reports/Annual%20Report%202020%20En.pdf [Accessed 15\u003csup\u003eth\u003c/sup\u003e June 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003ePappis, I., Howells, M., Sridharan, V., Usher, W., Shivakumar, A., Gardumi, F. \u0026amp; Ramos, E. (2019) \u003cem\u003eEnergy projections for African countries\u003c/em\u003e. Joint Research Centre Technical Report. Available at: https://www.researchgate.net/profile/Ioannis-Pappis/publication/337154878_Energy_projections_for_African_countries/links/5dc847e3a6fdcc57503dd5c1/Energy-projections-for-African-countries.pdf [Accessed 19th June 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eRady, Y., Rocco, M., Serag-Eldin, M. \u0026amp; Colombo, E. (2018) Modelling for power generation sector in Developing Countries: Case of Egypt. \u003cem\u003eEnergy\u003c/em\u003e, 165, 198-209.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eTaliotis, C., Shivakumar, A., Ramos, E., Howells, M., Mentis, D., Sridharan, V., Broad, O. \u0026amp; Mofor, L. (2016) An indicative analysis of investment opportunities in the African electricity supply sector \u0026ndash; Using TEMBA (The Electricity Model Base for Africa). \u003cem\u003eEnergy For Sustainable Development\u003c/em\u003e, 31, 50-66.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eTaliotis, C., Rogner, H., Ressl, S., Howells, M. \u0026amp; Gardumi, F. (2017) Natural Gas in Cyprus: the need for consolidated planning. \u003cem\u003eEnergy Policy\u003c/em\u003e, 107, 197-209.\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eUK Government (2022) \u003cem\u003eCOP26 Energy Transition Council: 2022 Strategic Priorities\u003c/em\u003e. UK Government. Available at: https://www.gov.uk/government/publications/cop26-energy-transition-council-2022-strategic-priorities/cop26-energy-transition-council-2022-strategic-priorities#strategic-priorities [Accessed 24th October 2022].\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eUnited Nations Development Programme (UNDP) (2018) \u003cem\u003eSustainable Development Goals Report: Egypt 2030\u003c/em\u003e. Available at: https://www.undp.org/sites/g/files/zskgke326/files/migration/eg/Sustainable-Development-Goals-Report.-Egypt-2030.pdf [Accessed 4th June 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eUNFCCC (n.d.) \u003cem\u003eIntended Nationally Determined Contribution from the Plurinational State of Bolivia.\u0026nbsp;\u003c/em\u003eAvailable at: https://www.un.org/development/desa/dpad/wp-content/uploads/sites/45/post/INDC-Bolivia-english.pdf [Accessed 18th June 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eUNFCCC (2017) \u003cem\u003eEgyptian Intended Nationally Determined Contribution\u003c/em\u003e. United Nations Convention on Climate Change. Available at: https://unfccc.int/sites/default/files/\u003c/p\u003e\n\u003cp\u003eNDC/2022-06/Egyptian%20INDC.pdf [Accessed 19\u003csup\u003eth\u003c/sup\u003e April 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eUNFCCC (2022) Egypt\u0026rsquo;s First Updated Nationally Determined Contributions. United Nations Convention on Climate Change. Available at: https://unfccc.int/sites/default/files/NDC/2022-07/Egypt%20Updated%20NDC.pdf.pdf [Accessed 17\u003csup\u003eth\u003c/sup\u003e July 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eWorld Bank (2019) \u003cem\u003eMaximising finance for development in Egypt\u0026rsquo;s energy sector\u003c/em\u003e. Available at: https://documents1.worldbank.org/curated/en/780061567532224696/pdf/Maximizing-Finance-for-Development-in-Egypts-Energy-Sector.pdf [Accessed 8th June 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u003cstrong\u003e\u003cu\u003e\u0026nbsp;\u003c/u\u003e\u003c/strong\u003e\u003c/p\u003e\n\u003cp\u003eWorld Bank (2021a) \u003cem\u003eMiddle East and North Africa\u003c/em\u003e. World Bank Group. Available at: \u0026nbsp;https://www.worldbank.org/en/region/mena/overview#1 [Accessed 3\u003csup\u003erd\u003c/sup\u003e July 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eWorld Bank (2021b) \u003cem\u003eUnemployment, total (% of labour force \u0026ndash; Egypt, Arab Rep\u003c/em\u003e. Available at: https://data.worldbank.org/indicator/SL.UEM.TOTL.ZS?locations=EG [Accessed 5\u003csup\u003eth\u003c/sup\u003e May 2022]. \u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eWorld Bank Group (2021) Egypt, Arab Rep. World Bank Group. Available at: https://data.worldbank.org/country/EG [Accessed 19th July 2022].\u0026nbsp;\u003c/p\u003e\n\u003cp\u003e\u0026nbsp;\u003c/p\u003e\n\u003cp\u003eZayed, D. \u0026amp; Sowers, J. (2014) The Campaign Against Coal in Egypt\u003cem\u003e. Middle East Report\u003c/em\u003e, 271 29-35.\u003c/p\u003e"}],"fulltextSource":"","fullText":"","funders":[],"hasAdminPriorityOnWorkflow":false,"hasManuscriptDocX":true,"hasOptedInToPreprint":true,"hasPassedJournalQc":"","hasAnyPriority":true,"hideJournal":true,"highlight":"","institution":"Imperial College London","isAcceptedByJournal":false,"isAuthorSuppliedPdf":false,"isDeskRejected":"","isHiddenFromSearch":false,"isInQc":false,"isInWorkflow":false,"isPdf":false,"isPdfUpToDate":true,"isWithdrawnOrRetracted":false,"journal":{"display":true,"email":"[email protected]","identity":"researchsquare","isNatureJournal":false,"hasQc":true,"allowDirectSubmit":true,"externalIdentity":"","sideBox":"","snPcode":"","submissionUrl":"/submission","title":"Research Square","twitterHandle":"researchsquare","acdcEnabled":true,"dfaEnabled":false,"editorialSystem":"","reportingPortfolio":"","inReviewEnabled":false,"inReviewRevisionsEnabled":true},"keywords":"Clean Energy Transition, Renewable Energy Technologies, OSeMOSYS, Egypt, Energy Policy","lastPublishedDoi":"10.21203/rs.3.rs-2526010/v4","lastPublishedDoiUrl":"https://doi.org/10.21203/rs.3.rs-2526010/v4","license":{"name":"CC BY 4.0","url":"https://creativecommons.org/licenses/by/4.0/"},"manuscriptAbstract":"\u003cp\u003eEgypt has the potential to generate significant amounts of renewable energy, in particular solar PV, concentrated solar power (CSP), and onshore and offshore wind. The energy sector is reliant on fossil fuels, particularly natural gas, for electricity production and is at risk of locking itself into a high carbon pathway. Globally, reducing greenhouse gas (GHG) emissions associated with national energy sectors is a target outlined in the UN’s Paris Agreement. To reduce carbon dioxide (CO\u003csub\u003e2\u003c/sub\u003e) emissions associated with a higher dependence on fossil fuels, Egypt must consider upscaling renewable energy technologies (RET) to achieve a clean energy transition (CET).\u003c/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c/p\u003e\n\u003cp\u003eThis research modelled six scenarios using OSeMOSYS to identify the technologies and policy target improvements that are needed to upscale RETs within Egypt’s energy sector. The results showed that solar PV and onshore wind are key technologies to be upscaled to contribute towards Egypt’s CET. The optimal renewable target is the International Renewable Energy Agency’s (IRENA) 53% of electricity to be sourced from RETs by 2030, which will cost $16.4 billion more up to 2035 than Egypt’s current Integrated Sustainable Energy Strategy (ISES) target of 42% by 2035; it also saves 732.0 Mt of CO\u003csub\u003e2\u003c/sub\u003e over the entire modelling period to 2070.\u003c/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c/p\u003e\n\u003cp\u003eSocio-economic barriers to this transition are considered, such as recent discoveries of natural gas reserves combined with a history of energy insecurity, political instability impacting investor confidence, and a lack of international climate funding. The paper concludes with policy recommendations that would enable Egypt to progress towards achieving a CET.\u003c/p\u003e","manuscriptTitle":"Long-term Energy System Modelling for a Clean Energy Transition in Egypt's Energy Sector","msid":"","msnumber":"","nonDraftVersions":[{"code":4,"date":"2023-04-24 17:35:15","doi":"10.21203/rs.3.rs-2526010/v4","editorialEvents":[{"type":"communityComments","content":0}],"status":"published","journal":{"display":true,"email":"[email protected]","identity":"researchsquare","isNatureJournal":false,"hasQc":true,"allowDirectSubmit":true,"externalIdentity":"","sideBox":"","snPcode":"","submissionUrl":"/submission","title":"Research Square","twitterHandle":"researchsquare","acdcEnabled":true,"dfaEnabled":false,"editorialSystem":"","reportingPortfolio":"","inReviewEnabled":false,"inReviewRevisionsEnabled":true}},{"code":3,"date":"2023-03-30 17:45:05","doi":"10.21203/rs.3.rs-2526010/v3","editorialEvents":[{"type":"communityComments","content":0}],"status":"published","journal":{"display":true,"email":"[email protected]","identity":"researchsquare","isNatureJournal":false,"hasQc":true,"allowDirectSubmit":true,"externalIdentity":"","sideBox":"","snPcode":"","submissionUrl":"/submission","title":"Research Square","twitterHandle":"researchsquare","acdcEnabled":true,"dfaEnabled":false,"editorialSystem":"","reportingPortfolio":"","inReviewEnabled":false,"inReviewRevisionsEnabled":true}},{"code":2,"date":"2023-03-27 18:03:11","doi":"10.21203/rs.3.rs-2526010/v2","editorialEvents":[{"type":"communityComments","content":0}],"status":"published","journal":{"display":true,"email":"[email protected]","identity":"researchsquare","isNatureJournal":false,"hasQc":true,"allowDirectSubmit":true,"externalIdentity":"","sideBox":"","snPcode":"","submissionUrl":"/submission","title":"Research Square","twitterHandle":"researchsquare","acdcEnabled":true,"dfaEnabled":false,"editorialSystem":"","reportingPortfolio":"","inReviewEnabled":false,"inReviewRevisionsEnabled":true}},{"code":1,"date":"2023-01-31 15:45:33","doi":"10.21203/rs.3.rs-2526010/v1","editorialEvents":[{"type":"communityComments","content":0}],"status":"published","journal":{"display":true,"email":"[email protected]","identity":"researchsquare","isNatureJournal":false,"hasQc":true,"allowDirectSubmit":true,"externalIdentity":"","sideBox":"","snPcode":"","submissionUrl":"/submission","title":"Research Square","twitterHandle":"researchsquare","acdcEnabled":true,"dfaEnabled":false,"editorialSystem":"","reportingPortfolio":"","inReviewEnabled":false,"inReviewRevisionsEnabled":true}}],"origin":"","ownerIdentity":"5f675b80-51ee-4c6c-9e41-f6a4c3727ce9","owner":[],"postedDate":"April 24th, 2023","published":true,"recentEditorialEvents":[],"rejectedJournal":[],"revision":"","amendment":"","status":"posted","subjectAreas":[],"tags":[],"updatedAt":"2023-01-31T15:45:33+00:00","versionOfRecord":[],"versionCreatedAt":"2023-04-24 17:35:15","video":"","vorDoi":"","vorDoiUrl":"","workflowStages":[]},"version":"v4","identity":"rs-2526010","journalConfig":"researchsquare"},"__N_SSP":true},"page":"/article/[identity]/[[...version]]","query":{"redirect":"/article/rs-2526010","identity":"rs-2526010","version":["v4"]},"buildId":"ApUGefWb6u5IBVtyqm6d5","isFallback":false,"isExperimentalCompile":false,"dynamicIds":[84888],"gssp":true,"scriptLoader":[]}

Text is read by the "Ask this paper" AI Q&A widget below. Extraction quality varies by source — PMC NXML preserves structure cleanly, OA-HTML may include some navigation residue, and OA-PDF can have broken hyphenation. The publisher copy (via DOI) is the canonical version.

My notes (saved in your browser only)

Ask this paper AI returns verbatim quotes from the full text · source: preprint-html

Answers must be backed by verbatim quotes from this paper's full text. Hallucinated quotes are dropped automatically; if no verbatim passage answers the question, we say so. How this works

Citation neighborhood (no data yet)

We don't have any in-corpus citations linked to this paper yet. The paper's references may be in our DB but unresolved to ``paper_id`` (resolution happens at ingest when the cited DOI matches a row we already have). Run the cross-source citation reconcile pass to retry.

Source provenance

europepmc
last seen: 2026-05-19T01:45:01.086888+00:00