Dynamic Scheduling of a Semiconductor Production Line Based on Composite Rule Set

preprint OA: closed CC-BY-4.0
🔓 Open OA copy View at publisher

Abstract

Various factors and constraints should be considered when developing a manufacturing production schedule, and such a schedule is often based on rules. This paper develops a composite dispatching rule based on heuristic rules that comprehensively consider various factors in a semiconductor production line. The composite rule is obtained by exploring various states of a semiconductor production line (machine status, queue size, etc.), where such indicators as makespan and equipment efficiency are used to judge performance. A model of the response surface, as a function of key variables, is then developed to find the optimized parameters of a composite rule for various production states. Further, dynamic scheduling of semiconductor manufacturing is studied based on support vector regression (SVR). This approach dynamically obtains a composite dispatching rule (i.e. parameters of the composite dispatching rule) that can be used to optimize production performance according to real-time production line state. Following optimization, the proposed dynamic scheduling approach is tested in a real semiconductor production line to validate the effectiveness of the proposed composite rule set.

My notes (saved in your browser only)

Citation neighborhood (no data yet)

We don't have any in-corpus citations linked to this paper yet. The paper's references may be in our DB but unresolved to ``paper_id`` (resolution happens at ingest when the cited DOI matches a row we already have). Run the cross-source citation reconcile pass to retry.

Source provenance

europepmc
last seen: 2026-05-19T01:45:01.086888+00:00
unpaywall
last seen: 2026-06-05T02:00:03.366016+00:00
License: CC-BY-4.0