A two-phase branch-and-bound algorithm for seru scheduling problems with sequence-dependent setup time

preprint OA: closed CC-BY-4.0
📄 Open PDF View at publisher

Abstract

This paper focuses on seru scheduling problems considering the sequence-dependent setup time in seru production system (SPS), which is a new-type manufacturing system originated in Japanese production practice recently that can better adapt to the fluctuate market demand. A mixed integer programming (MIP) model with the objective of minimizing the sum of the makespan and the weighted tardiness is constructed for the seru scheduling problem. The two-phase B&B (TPBB) algorithm is designed subsequently, where the first phase solves the assignment of products to serus , while the second phase solves the scheduling optimization in each seru . Finally, the computational experiments and comparative analysis with CPLEX 12.8 are made, and the report of results verifies that the effectiveness and practicability of the proposed MIP model and TPBB algorithm.

My notes (saved in your browser only)

Citation neighborhood (no data yet)

We don't have any in-corpus citations linked to this paper yet. The paper's references may be in our DB but unresolved to ``paper_id`` (resolution happens at ingest when the cited DOI matches a row we already have). Run the cross-source citation reconcile pass to retry.

Source provenance

europepmc
last seen: 2026-05-19T01:45:01.086888+00:00
unpaywall
last seen: 2026-06-04T02:00:05.705006+00:00
License: CC-BY-4.0