A Holistic Approach in Re-Mining Old Tailings Deposits for The Supply of Critical Metals: A Portuguese Case
preprint
OA: closed
CC-BY-4.0
Abstract
The growth of demand for metallic minerals has faced with the need for new techniques and improving technologies for all mine life cycle operations. Nowadays, the exploitation of old tailings and mine wastes facilities could represent a solution to this demand, with economic and environmental advantages. W-Sn Panasqueira Mine has been operating for more than 100 years. Its first processing plant “Rio” was located near Zêrere river being the mineral processing residues deposited on the top hillside on the margin of this river in Cabeço do Pião tailings dam. The lack of maintenance and monitoring of this enormous structure in the last twenty years represents high risks to the environment and population of the surrounding region. The re-mining of the tailings by hydrometallurgical methods was considered, in order to satisfy these two enounced conditions - metals demand and environmental risk, aiming for the sale of the metal to pay the environmental intervention. Field samples campaign allowed collecting data and results from laboratory tests driving to use regression optimization. The re-mining solution was studied, taking into account the technical, economic, social, and environmental aspects.
My notes (saved in your browser only)
Citation neighborhood (no data yet)
We don't have any in-corpus citations linked to this paper yet. The paper's references may be in our DB but unresolved to ``paper_id`` (resolution happens at ingest when the cited DOI matches a row we already have). Run the cross-source citation reconcile pass to retry.
Source provenance
- europepmc
- last seen: 2026-05-19T01:45:01.086888+00:00
- unpaywall
- last seen: 2026-05-26T02:00:01.498150+00:00
License: CC-BY-4.0