Relationships Between Step and Cumulative PMI and E-factors: Implications on Estimating Material Efficiency With Respect to Charting Synthesis Optimization Strategies
preprint
OA: closed
CC-BY-NC-ND-4.0
Abstract
This report describes mathematical relationships between step and cumulative process mass intensities (PMIs) for synthesis plans, and analogous parameters applied to Efactors. It is shown that both step E-factors and step PMIs are not additive for synthesis plans. It is also shown that a recursive calculation of cumulative PMIs from step PMIs isa rapid method of determining overall PMIs for synthesis plans, though cumulative PMIs are not sufficiently informative as step PMIs or step E-factors to identify bottlenecks insynthesis plans. Illustrations on the use of these metrics to track the material efficiency of published synthesis plans for the pharmaceutical, apixaban, are given as a templateexample. Advantages and disadvantages of each metric are discussed. A general algorithm to select the most promising candidate synthesis plans considered at the designstage for a given molecular target that most likely satisfy “green” material efficiency criteria is also presented.
My notes (saved in your browser only)
Citation neighborhood (no data yet)
We don't have any in-corpus citations linked to this paper yet. The paper's references may be in our DB but unresolved to ``paper_id`` (resolution happens at ingest when the cited DOI matches a row we already have). Run the cross-source citation reconcile pass to retry.
Source provenance
- europepmc
- last seen: 2026-05-19T01:45:01.086888+00:00
- unpaywall
- last seen: 2026-05-26T02:00:01.498150+00:00
License: CC-BY-NC-ND-4.0