Research on the Factors of Extremely Short Construction Period under the Sufficient Resources based on Grey- DEMATEL-ISM

preprint OA: closed CC-BY-4.0
🔓 Open OA copy View at publisher

Abstract

Under the condition of sufficient resources, there are many factors affecting the realization of extremely short construction period of engineering construction projects. Based on literature review and questionnaire survey, this paper firstly selected 17 influencing factors from the five dimensions of design, management, technology, policy and environment. And the factor analytic hierarchy process model was established based on Grey-DEMATEL-ISM. The model introduced the improved grey system theory and combined decision-making trial and evaluation laboratory (DEMATEL) with interpretative structural modeling method (ISM). In addition, the model can not only identify the critical factors in the system, but also present the internal logical relationship between the influencing factors through the multi-level hierarchical structure diagram. Finally, through the analysis of the influencing factors of extremely short construction period under the sufficient resources, it defined that the key factor is construction technology and the secondary factor is construction safety organization. The research results provide a theoretical basis for managers to realize the extremely short construction period under the sufficient resources.

My notes (saved in your browser only)

Citation neighborhood (no data yet)

We don't have any in-corpus citations linked to this paper yet. The paper's references may be in our DB but unresolved to ``paper_id`` (resolution happens at ingest when the cited DOI matches a row we already have). Run the cross-source citation reconcile pass to retry.

Source provenance

europepmc
last seen: 2026-05-19T01:45:01.086888+00:00
unpaywall
last seen: 2026-05-22T02:00:06.705733+00:00
License: CC-BY-4.0